Five jobs are waiting for processing through two work centers.Their processing time (in minutes) at each work center is contained in the table below.Each job requires work center Sigma before work center Delta.According to Johnson's rule,what sequence of jobs will minimize the completion time for all jobs?
A) R-S-T-U-V
B) S-V-T-R-U
C) S-U-T-V-R
D) V-R-U-S-T
E) R-V-T-S-U
Correct Answer:
Verified
Q65: Eight jobs have been sequenced at a
Q66: What does the use of the shortest
Q67: Sequencing (or dispatching):
A) assigns dates to specific
Q72: Five jobs are waiting to be processed.Their
Q72: Which of the following is a limitation
Q73: Which critical ratio value implies that a
Q74: What is the priority rule that sequences
Q80: Flow time represents the time:
A)an order spends
Q87: _ determines the order in which jobs
Q99: The priority rule that appears fair to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents