The class of software,with libraries of algorithms and heuristics from which to choose,has become known as
A) product life cycle (PLC) .
B) genetic algorithms.
C) Advanced planning and scheduling (APS) .
D) None of these answer choices is correct.
Correct Answer:
Verified
Q87: To maintain the synchronization required for theory
Q88: _ scheduling involves loading work onto the
Q89: Identifying the bottleneck is the _ step
Q90: What makes scheduling so difficult in a
Q91: A _ is shop paperwork that travels
Q93: A _ shows both planned and completed
Q94: A_ monitors work status,machine status,material usage,and availability.
A)drum-buffer-rope
Q95: _ provides the information to regulate the
Q96: Theory of constraints is a _ scheduling
Q97: The _ method of linear programming can