Setup time is not a component of the cumulative lead time for a manufactured product.
Correct Answer:
Verified
Q31: The pull system was developed by Ohno
Q32: The authority for a worker to stop
Q33: In a lean production system,kanban systems have
Q34: The output of a manufacturing cell is
Q35: Mixed-modeling sequencing is used at Toyota to
Q37: Unlike a pull system,a push system prevents
Q38: Internal setup activities can be performed when
Q39: The lower inventory levels resulting from small-lot
Q40: In lean production,a strong relationship exists between
Q41: Which of the following is not a