A highway contractor needs to locate a single supply point to provide road building materials to four projects.The four projects,which are all approximately the same magnitude,are located at the following coordinates.Coordinate units are in miles.
a.On the grid below,plot the locations of the four road-building sites.Properly label all points.
b.What is the centre of gravity?
c.If a single truck were sent from centre-of-gravity to each project and back (four round trips),how many miles would be traveled? (Hint: use the Pythagorean Theorem C =
).
d.Add the calculated centre of gravity to the grid. 
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q55: What is it called when competing companies
Q58: Why is "quality of life" an element
Q84: Location A would result in annual fixed
Q118: What kinds of location decisions are appropriate
Q121: A telecommunications firm is planning to lay
Q122: East Texas Seasonings is preparing to build
Q125: Using the factor ratings shown below,determine which
Q126: Suppose that a bus company is deciding
Q127: A small manufacturer is considering several locations
Q128: A manufacturer of stamped metal auto parts
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents