A highway contractor needs to locate a single supply point to provide road building materials to four projects.The four projects,which are all approximately the same magnitude,are located at the following coordinates.Coordinate units are in miles.
a.What is the center of gravity?
b.If a single truck were sent from center-of-gravity to each project and back (four round trips),how many miles would be traveled? (Hint: use the Pythagorean Theorem C = ).
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q84: Location A would result in annual fixed
Q94: A contractor for the military is looking
Q96: A manufacturing firm is considering three potential
Q97: A telecommunications firm is planning to lay
Q98: Service firms choose locations based,in part,on the
Q100: A school district is considering where in
Q101: Which of the following assumptions is NOT
Q107: Industrial firms choose locations that minimize cost,
Q112: Which of the following is a location
Q119: Service location strategies and goods-producing location strategies
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents