Figure 4-17
X-TREME Corporation has the following activities: creating bills of materials (BOM) , studying manufacturing capabilities, improving manufacturing processes, training employees, and designing tooling. The general ledger accounts reveal the following expenditures for manufacturing engineering:
The equipment is used for two activities: improving processes and designing tooling. Thirty-five percent of the equipment's time is used for improving processes and 65 percent is used for designing tools. The salaries are for two engineers. One is paid $50,000, while the other earns $25,000. The $50,000 engineer spends 40 percent of his time training employees in new processes and 60 percent of his time on improving processes. The remaining engineer spends equal time on all activities. Supplies are consumed in the following proportions:
-Refer to 4-17. What is the cost assigned to the designing tooling activity?
A) $81,250
B) $33,000
C) $25,000
D) $125,000
Correct Answer:
Verified
Q1: If activity-based costing is used, setups would
Q147: Figure 4-20
Quasi-Tech Corporation produces specially machined parts.
Q148: Figure 4-17
X-TREME Corporation has the following activities:
Q150: Figure 4-19
Attraction Corporation produces specially machined parts.
Q151: Figure 4-20
Quasi-Tech Corporation produces specially machined parts.
Q153: Figure 4-19
Attraction Corporation produces specially machined parts.
Q155: Batch-level costs are assigned using
A)non-unit-based activity drivers.
B)unit-based
Q155: Figure 4-18
Marion Manufacturing uses an activity-based costing
Q156: If activity-based costing is used, set-ups would
Q160: If activity-based costing is used, electricity usage
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents