Figure 4-19
Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plant wide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:
Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
-Refer to 4-19. What is (are) the facility-level activity(ies) ?
A) set-ups
B) inspecting
C) providing space
D) both a and b
Correct Answer:
Verified
Q10: Maintenance of the production equipment would be
Q28: If activity-based costing is used, security is
Q40: If activity-based costing is used, materials handling
Q138: Figure 4-16
Samson Company recently installed an activity-based
Q139: Figure 4-17
X-TREME Corporation has the following activities:
Q140: Figure 4-13
The Molotov plant of Kaboom Industries
Q142: Figure 4-20
Quasi-Tech Corporation produces specially machined parts.
Q147: Figure 4-20
Quasi-Tech Corporation produces specially machined parts.
Q148: Figure 4-17
X-TREME Corporation has the following activities:
Q152: If activity-based costing is used, modifications made
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents