Figure 4-19
Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plant wide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:
Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
-Refer to Figure 4-19. What is (are) the product-level activity(ies) ?
A) engineering
B) setups
C) inspecting
D) all of the above
Correct Answer:
Verified
Q1: If activity-based costing is used, setups would
Q148: Figure 4-17
X-TREME Corporation has the following activities:
Q150: Figure 4-19
Attraction Corporation produces specially machined parts.
Q151: Figure 4-20
Quasi-Tech Corporation produces specially machined parts.
Q152: Figure 4-17
X-TREME Corporation has the following activities:
Q155: Batch-level costs are assigned using
A)non-unit-based activity drivers.
B)unit-based
Q155: Figure 4-18
Marion Manufacturing uses an activity-based costing
Q156: If activity-based costing is used, set-ups would
Q158: Figure 4-18
Marion Manufacturing uses an activity-based costing
Q160: If activity-based costing is used, electricity usage
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents