McDuff Company uses a job-order costing system to compute product costs. There are two producing departments (P1 and P2) and two support departments (S1 and S2). The costs incurred in S1 and S2 are allocated to
Departments A and B and included in their factory overhead rates for costing products. S1 costs are allocated based on the number of employees, S2 costs are allocated based on direct labor hours, and the production departmental overhead rates are also based on direct labor hours. The following data are available for a recent period:
Required:
a. Prepare a schedule allocating the support department costs to the producing departments using the sequential allocation method. The department with the greatest percentage of interdepartmental services should be allocated first.
b. Determine the overhead rates per direct labor hour for P1 and P2.
c. Job A2 was completed during the period at a cost of $26,000 for direct materials and direct labor costs. This job required 21 direct labor hours in Department P1 and 15 direct labor hours in Department P2. What was the total cost of Job A2?
Correct Answer:
Verified
Q146: Compare and contrast the various methods of
Q158: Figure 7-7
Garden of Eden Company manufactures two
Q158: Algonquin Products produces two products, X and
Q159: Figure 7-7
Garden of Eden Company manufactures two
Q160: Carson Wood Products processes logs into four
Q163: Mainstream Corporation manufactures two products, I and
Q164: Mandala Inc. obtains two products and a
Q165: Saturn Company manufactures products X, Y, and
Q166: Vladimir, Inc. began the current period with
Q167: Albemarle, Inc., has two producing departments. Each
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents