Garman observes a worker assembling peanut valves and records the data displayed in the table.During one of the cycles,the worker knocked the shaft out of the fixture and had to realign the fixtures.What is the select time for this job element?
A) less than 23 seconds
B) greater than or equal to 23 seconds but less than 26 seconds
C) greater than or equal to 26 seconds but less than 29 seconds
D) greater than or equal to 29 seconds
Correct Answer:
Verified
Q25: When using a time study approach, the
Q30: During a time study,the following times were
Q35: Keith assembles peanut valves and the recorded
Q36: Keith assembles peanut valves and the recorded
Q38: The gentleman farmer recorded the time it
Q41: Table H.1
A worker was observed for four
Q45: Table H.1
A worker was observed for four
Q88: Which one of the following statements about
Q95: With the use of the methods time
Q96: A major disadvantage of the work sampling
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents