The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.25.The allowance factor for this endeavor is 5%.What is the standard time for this job element?
A) greater than or equal to 8.5 minutes
B) less than 8.5 minutes but greater than or equal to 8.0 minutes
C) less than 8.0 minutes but greater than or equal to 7.5 minutes
D) less than 7.5 minutes
Correct Answer:
Verified
Q9: The method used most often for setting
Q15: Timing the work elements using the snap-back
Q25: When using a time study approach, the
Q28: The gentleman farmer recorded the time it
Q31: The gentleman farmer recorded the time it
Q34: With a time study approach, the:
A) nature
Q35: Keith assembles peanut valves and the recorded
Q36: Keith assembles peanut valves and the recorded
Q38: Which one of the following statements about
Q97: As the sample size increases in a
Unlock this Answer For Free Now!