A quality manager has established a sampling plan that calls for a sample size of 100 units and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.01 and an LTPD of .05.Which of the following statements is TRUE? Table G.1 is appended to this exam.
A) Lowering the acceptance number to 1 will raise the probability of a type II error.
B) Increasing the sample size will increase α.
C) Raising the AQL to 0.02 will lower the chance of a type I error.
D) Reducing the LTPD to 0.04 will reduce the chance of a type II error.
Correct Answer:
Verified
Q12: What is the basic idea of incoming
Q44: A manufacturer wants a sampling plan in
Q52: A lot of 1,000 items is on
Q53: A single-sampling plan using a sample size
Q57: This OC curve represents a sampling plan
Q58: A company is developing an acceptance sampling
Q59: A quality manager has established a sampling
Q60: A company wants to develop an acceptance
Q71: A sample of 100 items is randomly
Q75: A rectified inspection plan requires that:
A) a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents