Case 8.1
The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of several toys.The waiting time for a container of the wheels during production is 0.25 day;average processing time is 0.15 day per container.Each container holds 200 wheels.The company uses 2000 wheels a day in the production of its products.
-Use the information in Case 8.1.Using a policy variable of 5%,calculate the number of Kanban containers needed for the wheels.
A) three or fewer
B) four or five
C) five or six
D) seven or more
Correct Answer:
Verified
Q15: Regarding the Eight Types of Waste that
Q44: A takt time of 90 seconds generates
Q53: In the Toyota Production System,services and goods
Q54: The production of 240 units during a
Q58: In lean systems,if a defective product is
Q72: Weeding out unnecessary items, neatly arranging what's
Q82: Justin Thyme used to run one batch
Q85: Which one of the following statements is
Q101: Which one of the following statements regarding
Q113: A Kanban system is an important mechanism
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents