In a drum-buffer-rope system, the lot size that moves from one work center to another for additional processing is a(n) :
A) process batch.
B) operations batch.
C) transfer batch.
D) rope batch.
Correct Answer:
Verified
Q44: _ is a planning and control system
Q45: Table 5.1
A company makes four products that
Q46: Table 5.1
A company makes four products that
Q47: What are two ways a process manager
Q48: A competent operations manager should first eliminate
Q50: Table 5.1
A company makes four products that
Q51: Variability of a firm's workload may create
Q52: Table 5.1
A company makes four products that
Q53: Short term capacity planning should be driven
Q54: What is a Drum-Buffer-Rope system for planning