Scenario 11.1 Sunshine Manufacturing Produces Three Products: X,Y,Z.The Production of These End
Scenario 11.1
Sunshine Manufacturing produces three products: X,Y,Z.The production of these end items is controlled by an MRP system.Each end item X is assembled with two components of A and one component of B.Each end item of Y is assembled with two components of C and one component of A.End item Z is assembled from one unit of D and one unit of C;D is manufactured from one unit of A;and C is manufactured from one unit of B.
-Use the information in Scenario 11.1.If item C has a manufacturing lead time of two weeks,and a planned receipt of 65 units is needed in week 4,which of the following statements is TRUE?
A) The planned order release in week 2 for item C is 130 units.
B) The gross requirements for item B in week 4 is 65 units.
C) The gross requirements for item B in week 2 is 130 units.
D) The gross requirements for item B in week 2 is 65 units.
Correct Answer:
Verified
Q41: Scenario 11.2 Q42: Lot-for-lot (L4L) is a rule that maintains Q49: Use the following partially completed MRP record Q52: Which of the following statements about MRP Q53: Management wishes to use a POQ lot-sizing Q56: MRP II ties MRP to the company's Q56: Which statement on MRP explosion is BEST? Q57: Use the following partially completed MRP record Q58: Which one of the following statements about Q60: Which one of the following is an
![]()
A)It
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents