Scenario 6.1
El Gran Raton, the producers of the finest carpincho wallets in all of Argentina, examined their production process in the form of a value stream map, displayed below.
Daniel Penfield artist
-Use the data in Scenario 6.1 to calculate the per unit processing time for Process A if El Gran Raton decides to run a batch size of 360 units. The per unit time is:
A) 310 seconds.
B) 46.67 seconds.
C) 340 seconds.
D) 696.67 seconds.
Correct Answer:
Verified
Q144: When implementing a lean system:
A) managers can
Q145: With a batch size of 300 units,
Q146: Scenario 6.1
El Gran Raton, the producers of
Q147: With a batch size of 300 units,
Q148: Implementing a lean system:
A) has the advantage
Q150: One big advantage of lean systems is
Q151: Value stream maps consist of a(n)_, a(n)_,
Q152: Scenario 6.1
El Gran Raton, the producers of
Q153: Lean systems do not need stable master
Q154: If frequent, small shipments of purchased items
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents