A manufacturer embarking on a Six Sigma program sets the goal of having true Six Sigma capability for all processes by the end of the month.If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.0,what must happen with the process standard deviation?
A) The process standard deviation must be doubled.
B) The process standard deviation must be reduced by a factor of six.
C) The process standard deviation must be cut in half.
D) The process tolerances should be doubled.
Correct Answer:
Verified
Q141: The upper and lower control limits for
Q159: A professor records the number of students
Q161: Taguchi's quality loss function should be centered
Q165: ISO 14000:2004 is a documentation standard that
Q166: Genichi Taguchi first combined engineering and statistical
Q166: MKS Inc., produces meter sticks that have
Q167: A company measures their Taguchi quality loss
Q168: A manufacturer embarking on a Six Sigma
Q172: A firm targeting Six Sigma quality will
Q175: MKS Inc., produces meter sticks that have
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents