A highway contractor needs to locate a single supply point to provide road building materials to four projects.The four projects,which are all approximately the same magnitude,are located at the following coordinates.Coordinate units are in miles.
a.On the grid below,plot the locations of the four road-building sites.Properly label all points.
b.What is the centre of gravity?
c.If a single truck were sent from centre-of-gravity to each project and back (four round trips),how many miles would be traveled? (Hint: use the Pythagorean Theorem C = ).
d.Add the calculated centre of gravity to the grid.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q47: Identify five factors that affect location decisions
Q72: Identify the four major quantitative methods for
Q84: Location A would result in annual fixed
Q86: A small producer of music boxes wants
Q107: What kinds of location decisions are appropriate
Q121: A manager has received an analysis of
Q122: A telecommunications firm is planning to lay
Q126: The owner of a millwork shop is
Q127: A contractor for the military is looking
Q131: A grocery chain is deciding on where
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents