The assignment method is
A) a method to highlight overloads in a given work centre.
B) a computerized method of determining appropriate tasks for an operation.
C) a form of linear programming for optimally assigning tasks or jobs to resources.
D) the same thing as the Gantt schedule chart.
E) a method for achieving a balance between forward and backward scheduling.
Correct Answer:
Verified
Q27: If job 5 takes 3,4 or 5
Q41: The production database containing information about each
Q42: The short-term scheduling activity called loading
A) assigns
Q43: Three jobs are to be assigned
Q44: A work centre is interested in limiting
Q48: If an assignment problem consists of 5
Q49: Which of the following files tracks work
Q51: A scheduling technique used to achieve optimum,
Q55: Using LPT priority would result in what
Q71: Orders are processed in the sequence in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents