Deck 13: Developing Information Systems

ملء الشاشة (f)
exit full mode
سؤال
The direct cutover strategy replaces the old system entirely with the new system on an appointed day.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
TQM consists of setting strict standards for products,services,and other activities and then measuring performance against those standards.
سؤال
The information requirements of a new system involve identifying who needs what information,where,when,and how.Requirements analysis carefully defines the objectives of the new or modified system and develops a detailed description of the functions that the new system must perform.
سؤال
System testing tests the functioning of the information system as a whole.
سؤال
Systems design is the analysis of the problem that the organization will try to solve with an information system.
سؤال
The pilot study strategy introduces the new system to only a limited area of the organization,such as a single department or operating unit.
سؤال
Acceptance testing provides the final certification that the system is ready to be used in a production setting.
سؤال
Many companies today are focusing on developing new information systems that will improve their business processes.
سؤال
The activities that go into producing an information system solution to an organizational problem or opportunity are called systems analysis.
سؤال
The most common form of IT-enabled organizational change is automation.
سؤال
Work flow management is the process of streamlining business procedures so that documents can be moved easily and efficiently.
سؤال
Conversion is the process of changing from the old system to the new system.
سؤال
Calculating paycheques and payroll registers,giving bank tellers instant access to customer deposit records are both examples of early automation.
سؤال
The systems design would include a feasibility study to determine whether that solution was feasible or achievable from a financial,technical,and organizational standpoint.
سؤال
One of the most important strategic decisions that a firm can make is not deciding how to use information systems to improve business processes but rather understanding what business processes need improvement.
سؤال
In a parallel strategy,both the old system and its potential replacement are run together for a time until everyone is assured that the new one functions correctly.
سؤال
Seven sigma is a specific measure of quality,representing 3.4 defects per million opportunities.
سؤال
Work flow management (WFM)enables organizations to manage incremental process changes that are required simultaneously in many areas of the business.
سؤال
A paradigm shift involves rethinking the nature of the business and the nature of the organization.
سؤال
Unit testing,or program testing,consists of testing each program separately in the system.
سؤال
Request for Proposal (RFP)is a detailed list of questions submitted to packaged-software vendors.
سؤال
Thorough testing is not required if,during the programming stage,the design documents are sufficiently detailed.
سؤال
A problem with prototyping is that the systems constructed using this method may not be able to handle large quantities of data in a production environment.
سؤال
The system is not in production until conversion is complete.
سؤال
Objects are grouped into hierarchies,and hierarchies into classes.
سؤال
A structure chart is a bottom-up chart,showing each level of design,its relationship to other levels,and its place in the overall design structure.
سؤال
A data flow diagram offers a logical and graphical model of information flow,partitioning a system into modules that show manageable levels of detail.
سؤال
The phased approach strategy introduces the new system in stages,either by functions or by organizational units.
سؤال
CASE tools facilitate the creation of clear documentation and the coordination of team development efforts.
سؤال
Prototyping is more iterative than the conventional lifecycle.
سؤال
Object-oriented development is more incremental than traditional structured development.
سؤال
Failure to address properly the organizational changes surrounding the introduction of a new system can cause the demise of an otherwise good system.
سؤال
Rationalization of procedures describes a radical rethinking of the business models.
سؤال
Rationalization allows a software package to be modified to meet an organization's unique requirements without destroying the integrity of the package software.
سؤال
Documentation reveals how well the system has met its original objectives.
سؤال
The systems life cycle consists of developing an experimental system rapidly and inexpensively for end users to evaluate.
سؤال
TQM describes the measurement of quality as 3.4 defects per million.
سؤال
The oldest method for building information systems is prototyping.
سؤال
End-user languages are software tools that provide immediate online answers to requests for information that are not predefined.
سؤال
Object-oriented development uses the kernel as the basic unit of systems analysis and design.
سؤال
To be used effectively,CASE tools require organizational discipline.
سؤال
Systems development activities always take place in sequential order.
سؤال
New information systems are an outgrowth of a process of organizational problem solving.
سؤال
Hidden costs typically increase the total cost of an offshore outsourcing project by an extra 50 to 75 percent.
سؤال
The local bank has taken their loan application screening process and input the loan application into a computer database.This makes it possible for those who process the loan to do it faster and more efficiently.This is an example of ________.

A)a paradigm shift
B)re-engineering
C)rationalization
D)automation
سؤال
Approximately 20 percent of the time devoted to maintenance is used for debugging or correcting emergency production problems.
سؤال
The four kinds of structural organizational change enabled by IT,in order from least to most risky,are

A)rationalization,automation,reengineering,and redesigning.
B)rationalization,automation,reengineering,and paradigm shift.
C)automation,rationalization,reengineering,and paradigm shift.
D)automation,redesigning,restructuring,and paradigm shift.
سؤال
Paradigm shifts and prototyping often fail because extensive organizational change is so difficult to orchestrate.
سؤال
Once the existing process is mapped and measured in terms of time and cost,the process design team is finished.
سؤال
Systems development can be broken down into six core activities.
سؤال
Once a process has been implemented and optimized,it needs to be measured twice.
سؤال
One advantage of fourth-generation tools is that they can easily handle processing large numbers of transactions or applications with extensive procedural logic and updating requirements.
سؤال
There are alternative methodologies for modelling and designing systems,the most prominent are structured methodologies and object-oriented development.
سؤال
Developing a new information system is one kind of unplanned organizational change.
سؤال
Information technology can promote various degrees of organizational change,ranging from large to far-reaching.
سؤال
The Canadian trucking and transportation firm Trans-X used new information systems to change its business model.Trans-X created a new business managing the logistics for other companies.This more radical form of business change is called ________.

A)a paradigm shift
B)re-engineering
C)rationalization
D)automation
سؤال
________ is a specific measure of quality,representing 3.4 defects per million opportunities.

A)Six sigma
B)TQM
C)BPM
D)BPR
سؤال
End-user-developed systems can be completed more rapidly than those developed through the conventional systems lifecycle.
سؤال
Ford Motor Company's invoiceless processing,which reduced headcount in Ford's North American accounts payable organization of 500 people by 75 percent.Ford changed its accounts payable process so that the purchasing department enters a purchase order into an online database that can be checked by the receiving department when the ordered items arrive.If the received goods match the purchase order,the system automatically generates a cheque for accounts payable to send to the vendor.There is no need for vendors to send invoices.This is an example of ________.

A)a paradigm shift
B)re-engineering
C)rationalization
D)automation
سؤال
In some forms of outsourcing,a company hires an external vendor to create the software for its system,but operates the software on its own computers.
سؤال
Business processes are analyzed,simplified,and redesigned in

A)BPR.
B)rationalization of procedures.
C)automation.
D)a paradigm shift.
سؤال
The process of streamlining business procedures so that documents can be moved easily and efficiently is called

A)business process reengineering
B)automation
C)work flow management
D)rationalization
سؤال
Which of the following statements about business process reengineering is NOT true?

A)It is primarily an ongoing effort by a firm that continually readjusts and measures the effectiveness of new procedures.
B)It typically focuses on one or two strategic business processes that need radical change.
C)BPR projects tend to be expensive and organizationally disruptive.
D)To judge effectiveness,the performance of a business process should be measured both before and after re-engineering.
سؤال
John is in the process describing what the new system should do to meet information requirements,and John will show how the system will fulfill this objective.Like the blueprint of a building or house,John will give all the specifications that give the system its form and structure.John details the system specifications that will deliver the functions identified during systems analysis.John is in which stage of system development?

A)system design
B)system analysis
C)programming
D)testing
سؤال
Bobby has decided on a conversion strategy to the new system.In this strategy,he will introduce the new system in stages,either by functions or by organizational units.If,for example,the system is introduced by functions,a new payroll system might begin with hourly workers who are paid weekly,followed six months later by adding salaried employees (who are paid monthly)to the system.If the system is introduced by organizational units,corporate headquarters might be converted first,followed by outlying operating units four months later.Which conversion strategy are they employing?

A)phased approach strategy
B)pilot study strategy
C)direct cutover strategy
D)parallel strategy
سؤال
In the case of ________,the decision tends to be much more cost-driven.A skilled programmer in India or Russia earns about $11 000 per year,compared to $65 000 per year for a comparable programmer in Canada.

A)offshore outsourcing
B)outsourcing
C)end users
D)off the shelf
سؤال
John is in the process of developing a new system.John is defining the problem,identifying its causes,specifying the solution,and identifying the information requirements that must be met by a system solution.John creates a road map of the existing organization and systems,identifying the primary owners and users of data along with existing hardware and software.John will then detail the problems of existing systems.By examining documents,work papers,and procedures;observing system operations;and interviewing key users of the systems,John can identify the problem areas and objectives a solution would achieve.John is in which stage of system development?

A)system design
B)system analysis
C)programming
D)testing
سؤال
The idea that the achievement of quality control is an end in itself describes a main concept of

A)BPM.
B)BPR.
C)six sigma.
D)TQM.
سؤال
________ provide(s)a methodology and tools for dealing with the organization's ongoing need to revise-and ideally optimize-its numerous internal business processes and processes shared with other organizations.

A)BPR
B)BPM
C)CASE tools
D)TQM
سؤال
Which process develops a detailed description of the functions that a new information system must perform?

A)feasibility study
B)requirements analysis
C)systems design
D)test plan development
سؤال
Eddy has decided on a conversion strategy to the new system.In this strategy,it replaces the old system entirely with the new system on an appointed day.It is a very risky approach that can potentially be more costly than running two systems in parallel if serious problems with the new system are found.There is no other system to fall back on.Dislocations,disruptions,and the cost of corrections may be enormous.Which conversion strategy are they employing?

A)phased approach strategy
B)pilot study strategy
C)direct cutover strategy
D)parallel strategy
سؤال
Based on your reading of the chapter,the redesign of mortgage application process by major mortgage banks was an example of which type of organizational change?

A)automation
B)paradigm shift
C)business process reengineering
D)restructuring
سؤال
In automation

A)business processes are simplified.
B)business processes are reorganized to cut waste and eliminate repetitive,paper-intensive tasks.
C)standard operating procedures are streamlined to remove bottlenecks.
D)employees are enabled to perform their tasks more efficiently.
سؤال
Enabling organizations to make continual improvements to many business processes and to use processes as the fundamental building blocks of corporate information systems is the goal of

A)BPM.
B)BPR.
C)reengineering.
D)work flow management.
سؤال
John is in the process of developing a new system.This current stage is exhaustive and thorough and must be conducted to ascertain whether the system produces the right results.John must answer the question,"Will the system produce the desired results under known conditions?" The amount of time needed to answer this question has been traditionally underrated in systems project planning.This stage is time consuming: data must be carefully prepared,results reviewed,and corrections made in the system.In some instances,parts of the system may have to be redesigned.The risks resulting from glossing over this step are enormous.John is in which stage of system development?

A)system design
B)system analysis
C)programming
D)testing
سؤال
Susan has decided on a conversion strategy to the new system.In this strategy,both the old system and its potential replacement are run together for a time until everyone is assured that the new one functions correctly.This is the safest conversion approach because,in the event of errors or processing disruptions,the old system can still be used as a backup.However,this approach is very expensive,and additional staff or resources may be required to run the extra system.Which conversion strategy are they employing?

A)phased approach strategy
B)pilot study strategy
C)direct cutover strategy
D)parallel strategy
سؤال
John is in the process of developing a new system.During the current stage,system specifications that were prepared during the design stage are translated into software program code.John is in which stage of system development?

A)system design
B)system analysis
C)programming
D)testing
سؤال
The entire system-building effort is driven by

A)organizational change.
B)feasibility studies.
C)the information value chain.
D)user information requirements.
سؤال
Eddy has decided on a conversion strategy to the new system.In this strategy,it introduces the new system to only a limited area of the organization,such as a single department or operating unit.When this limited area is complete and working smoothly,it is installed throughout the rest of the organization,either simultaneously or in stages.Which conversion strategy are they employing?

A)phased approach strategy
B)pilot study strategy
C)direct cutover strategy
D)parallel strategy
سؤال
________ focuses on rapid delivery of working software by breaking a large project into a series of small sub-projects that are completed in short periods of time using iteration and continuous feedback.

A)JAD
B)RAD
C)Prototyping
D)Agile development
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/200
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Developing Information Systems
1
The direct cutover strategy replaces the old system entirely with the new system on an appointed day.
True
2
TQM consists of setting strict standards for products,services,and other activities and then measuring performance against those standards.
False
3
The information requirements of a new system involve identifying who needs what information,where,when,and how.Requirements analysis carefully defines the objectives of the new or modified system and develops a detailed description of the functions that the new system must perform.
True
4
System testing tests the functioning of the information system as a whole.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
5
Systems design is the analysis of the problem that the organization will try to solve with an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
6
The pilot study strategy introduces the new system to only a limited area of the organization,such as a single department or operating unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
7
Acceptance testing provides the final certification that the system is ready to be used in a production setting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
8
Many companies today are focusing on developing new information systems that will improve their business processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
9
The activities that go into producing an information system solution to an organizational problem or opportunity are called systems analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
10
The most common form of IT-enabled organizational change is automation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
11
Work flow management is the process of streamlining business procedures so that documents can be moved easily and efficiently.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
12
Conversion is the process of changing from the old system to the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
13
Calculating paycheques and payroll registers,giving bank tellers instant access to customer deposit records are both examples of early automation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
14
The systems design would include a feasibility study to determine whether that solution was feasible or achievable from a financial,technical,and organizational standpoint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
15
One of the most important strategic decisions that a firm can make is not deciding how to use information systems to improve business processes but rather understanding what business processes need improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
16
In a parallel strategy,both the old system and its potential replacement are run together for a time until everyone is assured that the new one functions correctly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
17
Seven sigma is a specific measure of quality,representing 3.4 defects per million opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
18
Work flow management (WFM)enables organizations to manage incremental process changes that are required simultaneously in many areas of the business.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
19
A paradigm shift involves rethinking the nature of the business and the nature of the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
20
Unit testing,or program testing,consists of testing each program separately in the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
21
Request for Proposal (RFP)is a detailed list of questions submitted to packaged-software vendors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
22
Thorough testing is not required if,during the programming stage,the design documents are sufficiently detailed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
23
A problem with prototyping is that the systems constructed using this method may not be able to handle large quantities of data in a production environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
24
The system is not in production until conversion is complete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
25
Objects are grouped into hierarchies,and hierarchies into classes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
26
A structure chart is a bottom-up chart,showing each level of design,its relationship to other levels,and its place in the overall design structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
27
A data flow diagram offers a logical and graphical model of information flow,partitioning a system into modules that show manageable levels of detail.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
28
The phased approach strategy introduces the new system in stages,either by functions or by organizational units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
29
CASE tools facilitate the creation of clear documentation and the coordination of team development efforts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
30
Prototyping is more iterative than the conventional lifecycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
31
Object-oriented development is more incremental than traditional structured development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
32
Failure to address properly the organizational changes surrounding the introduction of a new system can cause the demise of an otherwise good system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
33
Rationalization of procedures describes a radical rethinking of the business models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
34
Rationalization allows a software package to be modified to meet an organization's unique requirements without destroying the integrity of the package software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
35
Documentation reveals how well the system has met its original objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
36
The systems life cycle consists of developing an experimental system rapidly and inexpensively for end users to evaluate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
37
TQM describes the measurement of quality as 3.4 defects per million.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
38
The oldest method for building information systems is prototyping.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
39
End-user languages are software tools that provide immediate online answers to requests for information that are not predefined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
40
Object-oriented development uses the kernel as the basic unit of systems analysis and design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
41
To be used effectively,CASE tools require organizational discipline.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
42
Systems development activities always take place in sequential order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
43
New information systems are an outgrowth of a process of organizational problem solving.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
44
Hidden costs typically increase the total cost of an offshore outsourcing project by an extra 50 to 75 percent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
45
The local bank has taken their loan application screening process and input the loan application into a computer database.This makes it possible for those who process the loan to do it faster and more efficiently.This is an example of ________.

A)a paradigm shift
B)re-engineering
C)rationalization
D)automation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
46
Approximately 20 percent of the time devoted to maintenance is used for debugging or correcting emergency production problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
47
The four kinds of structural organizational change enabled by IT,in order from least to most risky,are

A)rationalization,automation,reengineering,and redesigning.
B)rationalization,automation,reengineering,and paradigm shift.
C)automation,rationalization,reengineering,and paradigm shift.
D)automation,redesigning,restructuring,and paradigm shift.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
48
Paradigm shifts and prototyping often fail because extensive organizational change is so difficult to orchestrate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
49
Once the existing process is mapped and measured in terms of time and cost,the process design team is finished.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
50
Systems development can be broken down into six core activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
51
Once a process has been implemented and optimized,it needs to be measured twice.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
52
One advantage of fourth-generation tools is that they can easily handle processing large numbers of transactions or applications with extensive procedural logic and updating requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
53
There are alternative methodologies for modelling and designing systems,the most prominent are structured methodologies and object-oriented development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
54
Developing a new information system is one kind of unplanned organizational change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
55
Information technology can promote various degrees of organizational change,ranging from large to far-reaching.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
56
The Canadian trucking and transportation firm Trans-X used new information systems to change its business model.Trans-X created a new business managing the logistics for other companies.This more radical form of business change is called ________.

A)a paradigm shift
B)re-engineering
C)rationalization
D)automation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
57
________ is a specific measure of quality,representing 3.4 defects per million opportunities.

A)Six sigma
B)TQM
C)BPM
D)BPR
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
58
End-user-developed systems can be completed more rapidly than those developed through the conventional systems lifecycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
59
Ford Motor Company's invoiceless processing,which reduced headcount in Ford's North American accounts payable organization of 500 people by 75 percent.Ford changed its accounts payable process so that the purchasing department enters a purchase order into an online database that can be checked by the receiving department when the ordered items arrive.If the received goods match the purchase order,the system automatically generates a cheque for accounts payable to send to the vendor.There is no need for vendors to send invoices.This is an example of ________.

A)a paradigm shift
B)re-engineering
C)rationalization
D)automation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
60
In some forms of outsourcing,a company hires an external vendor to create the software for its system,but operates the software on its own computers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
61
Business processes are analyzed,simplified,and redesigned in

A)BPR.
B)rationalization of procedures.
C)automation.
D)a paradigm shift.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
62
The process of streamlining business procedures so that documents can be moved easily and efficiently is called

A)business process reengineering
B)automation
C)work flow management
D)rationalization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
63
Which of the following statements about business process reengineering is NOT true?

A)It is primarily an ongoing effort by a firm that continually readjusts and measures the effectiveness of new procedures.
B)It typically focuses on one or two strategic business processes that need radical change.
C)BPR projects tend to be expensive and organizationally disruptive.
D)To judge effectiveness,the performance of a business process should be measured both before and after re-engineering.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
64
John is in the process describing what the new system should do to meet information requirements,and John will show how the system will fulfill this objective.Like the blueprint of a building or house,John will give all the specifications that give the system its form and structure.John details the system specifications that will deliver the functions identified during systems analysis.John is in which stage of system development?

A)system design
B)system analysis
C)programming
D)testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
65
Bobby has decided on a conversion strategy to the new system.In this strategy,he will introduce the new system in stages,either by functions or by organizational units.If,for example,the system is introduced by functions,a new payroll system might begin with hourly workers who are paid weekly,followed six months later by adding salaried employees (who are paid monthly)to the system.If the system is introduced by organizational units,corporate headquarters might be converted first,followed by outlying operating units four months later.Which conversion strategy are they employing?

A)phased approach strategy
B)pilot study strategy
C)direct cutover strategy
D)parallel strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
66
In the case of ________,the decision tends to be much more cost-driven.A skilled programmer in India or Russia earns about $11 000 per year,compared to $65 000 per year for a comparable programmer in Canada.

A)offshore outsourcing
B)outsourcing
C)end users
D)off the shelf
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
67
John is in the process of developing a new system.John is defining the problem,identifying its causes,specifying the solution,and identifying the information requirements that must be met by a system solution.John creates a road map of the existing organization and systems,identifying the primary owners and users of data along with existing hardware and software.John will then detail the problems of existing systems.By examining documents,work papers,and procedures;observing system operations;and interviewing key users of the systems,John can identify the problem areas and objectives a solution would achieve.John is in which stage of system development?

A)system design
B)system analysis
C)programming
D)testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
68
The idea that the achievement of quality control is an end in itself describes a main concept of

A)BPM.
B)BPR.
C)six sigma.
D)TQM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
69
________ provide(s)a methodology and tools for dealing with the organization's ongoing need to revise-and ideally optimize-its numerous internal business processes and processes shared with other organizations.

A)BPR
B)BPM
C)CASE tools
D)TQM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
70
Which process develops a detailed description of the functions that a new information system must perform?

A)feasibility study
B)requirements analysis
C)systems design
D)test plan development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
71
Eddy has decided on a conversion strategy to the new system.In this strategy,it replaces the old system entirely with the new system on an appointed day.It is a very risky approach that can potentially be more costly than running two systems in parallel if serious problems with the new system are found.There is no other system to fall back on.Dislocations,disruptions,and the cost of corrections may be enormous.Which conversion strategy are they employing?

A)phased approach strategy
B)pilot study strategy
C)direct cutover strategy
D)parallel strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
72
Based on your reading of the chapter,the redesign of mortgage application process by major mortgage banks was an example of which type of organizational change?

A)automation
B)paradigm shift
C)business process reengineering
D)restructuring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
73
In automation

A)business processes are simplified.
B)business processes are reorganized to cut waste and eliminate repetitive,paper-intensive tasks.
C)standard operating procedures are streamlined to remove bottlenecks.
D)employees are enabled to perform their tasks more efficiently.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
74
Enabling organizations to make continual improvements to many business processes and to use processes as the fundamental building blocks of corporate information systems is the goal of

A)BPM.
B)BPR.
C)reengineering.
D)work flow management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
75
John is in the process of developing a new system.This current stage is exhaustive and thorough and must be conducted to ascertain whether the system produces the right results.John must answer the question,"Will the system produce the desired results under known conditions?" The amount of time needed to answer this question has been traditionally underrated in systems project planning.This stage is time consuming: data must be carefully prepared,results reviewed,and corrections made in the system.In some instances,parts of the system may have to be redesigned.The risks resulting from glossing over this step are enormous.John is in which stage of system development?

A)system design
B)system analysis
C)programming
D)testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
76
Susan has decided on a conversion strategy to the new system.In this strategy,both the old system and its potential replacement are run together for a time until everyone is assured that the new one functions correctly.This is the safest conversion approach because,in the event of errors or processing disruptions,the old system can still be used as a backup.However,this approach is very expensive,and additional staff or resources may be required to run the extra system.Which conversion strategy are they employing?

A)phased approach strategy
B)pilot study strategy
C)direct cutover strategy
D)parallel strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
77
John is in the process of developing a new system.During the current stage,system specifications that were prepared during the design stage are translated into software program code.John is in which stage of system development?

A)system design
B)system analysis
C)programming
D)testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
78
The entire system-building effort is driven by

A)organizational change.
B)feasibility studies.
C)the information value chain.
D)user information requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
79
Eddy has decided on a conversion strategy to the new system.In this strategy,it introduces the new system to only a limited area of the organization,such as a single department or operating unit.When this limited area is complete and working smoothly,it is installed throughout the rest of the organization,either simultaneously or in stages.Which conversion strategy are they employing?

A)phased approach strategy
B)pilot study strategy
C)direct cutover strategy
D)parallel strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
80
________ focuses on rapid delivery of working software by breaking a large project into a series of small sub-projects that are completed in short periods of time using iteration and continuous feedback.

A)JAD
B)RAD
C)Prototyping
D)Agile development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 200 في هذه المجموعة.