Deck 3: The Project Manager

ملء الشاشة (f)
exit full mode
سؤال
The project manager should be more skilled at __________,whereas the functional manager should be more skilled at __________.

A)synthesis; analysis
B)analysis; synthesis
C)communication; managing
D)managing,analysis
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The project manager's responsibility to the project and to the client is met by ensuring that the __________ of the project is preserved in spite of conflicting demands made by stakeholders.

A)management
B)integrity
C)analysis
D)synthesis
سؤال
What is scope creep?

A)A change in the budget for the project
B)A reduction in what is required for the project in order to reduce the budget
C)A change in what is required for the project
D)A change in the budget for the project
سؤال
The __________ states that to understand the system,we must understand the environment (or larger system)of which it is a part.

A)systems approach
B)cultural awareness
C)systemic congruence
D)project management
سؤال
How are most of the workers on a project acquired?

A)Temporary agencies
B)Borrowed from functional departments
C)Transferred from functional departments
D)Subcontractors
سؤال
According to the authors,three major questions face the project manager with respect to synthesizing the requirements of a project.Identify the item that is not listed as one of the three major questions.

A)What needs to be done?
B)Who will actually do the work of the project?
C)When must it be done?
D)How will the required resources be obtained?
سؤال
According to the authors,the analytic method,when applied to systems,focuses on __________.

A)assembling the components of a system into an integrated package
B)building an array of individually designed and manufactured components
C)calculating the cost and schedule requirements
D)dividing the components of a system into smaller and smaller elements
سؤال
Which of the following is not an important characteristic for effective team members?

A)High-quality technical skills
B)Political,and general,sensitivity
C)High self-esteem
D)Strong sense of self
سؤال
According to the authors the project manager should be more skilled at __________.

A)general management
B)technology
C)synthesis
D)analysis
سؤال
Which of the following is not typically recommended to be considered when hiring new team members?

A)high-quality technical skills
B)political,and general,sensitivity
C)strong goal orientation
D)low self-esteem
سؤال
The Project Management Institute (PMI)offers a certification for project managers.PMI offers examination for certification as __________.

A)Project Management Professionals
B)Project Management Experts
C)Project Management Associates
D)Project Management Engineers
سؤال
The project manager's responsibilities are broad and fall primarily into three separate areas.Responsibilities to _____________ is not one of these.

A)the parent organization
B)the project and the client
C)the members of the project team
D)special-interest groups
سؤال
Identify the attribute that is not normally associated with the job of functional manager.

A)The functional manager is usually a generalist in the area being managed.
B)The functional manager is responsible for deciding what resources will be devoted to accomplishing the task.
C)The functional manager is administratively responsible for deciding how something will be done.
D)The functional manager is responsible for deciding who will do the work.
سؤال
Which of the following is one of the most serious crises for the project manager?

A)Change in the budget for a project
B)A key worker leaving the project
C)A technical issue
D)Change in required project scope
سؤال
The ideal project manager should be __________.

A)a direct,technical supervisor knowledgeable in the technology of the process being used
B)both generalist / facilitator and have a high level of technical competence in the science of the project
C)a facilitator and specialist with technical credibility
D)a technical specialist competent in principles of robust design
سؤال
___________ is when someone takes over the project manager's job by exercising extremely close supervision over every action the project manager takes,or will actually tell the project manager precisely what to do.

A)Micromanagement
B)Over-management
C)Turnover
D)Supermanagement
سؤال
Research has shown that the chances for successful completion of a multidisciplinary project are greatly increased if project team members are _____ rather than _______,

A)problem-oriented; discipline-oriented
B)discipline-oriented; problem-oriented
C)problem-oriented; management-oriented
D)management-oriented; problem-oriented
سؤال
Resources initially budgeted for a project are frequently __________ for the task,partly because of natural optimism by the proposer about how many resources are needed.

A)sufficient
B)delayed
C)insufficient
D)hindrances
سؤال
The functional manager uses the __________ approach and the PM uses the __________ approach.

A)systems; analytic
B)numerical; nonnumeric
C)analytic; systems
D)nonnumeric; numerical
سؤال
When managing a project,the project manager is responsible for __________.

A)auditing the project
B)executing the project
C)budgeting the project
D)designing the project
سؤال
During the final or phaseout stage of the project lifecycle,__________ is the dominant goal of many project managers.

A)schedule
B)cost
C)scope
D)quality
سؤال
__________ result(s)when the demands made on an individual are greater than the person's ability to cope with them,particularly when the person has a high need for achievement.

A)Stress
B)Culture
C)Balance
D)Contingency plans
سؤال
The ability to sense conflict early,then confront and deal with it before the conflict escalates into interdepartmental and intradepartmental warfare is which of the following attributes?

A)credibility
B)sensitivity
C)competency
D)ability to handle stress
سؤال
In order to meet the demands of the job of project manager-acquiring adequate resources,acquiring and motivating personnel,dealing with obstacles,making project goal trade-offs,maintaining a balanced outlook,and establishing a broad network of communication-the project manager must be a(n)_______________.

A)highly skilled negotiator
B)hard worker
C)effective budgeter
D)cultural expert
سؤال
Most of the time spent by a project manager is spent __________.

A)attending technical workshops
B)overseeing the workforce
C)filing paperwork
D)communicating
سؤال
During the buildup stage of a project life cycle,__________ is the dominant goal of many project managers.

A)schedule
B)cost
C)scope
D)quality
سؤال
During the __________ stage of the project lifecycle,there is no significant difference in the importance that project managers place on the three goals of cost,time,and scope.

A)main
B)formation
C)buildup
D)phaseout
سؤال
Project managers must have __________,which refers to possessing enough technical abilities to direct the project.

A)technical credibility
B)managerial credibility
C)negotiation skill
D)drive to complete the task
سؤال
The project manager needs __________ credibility.

A)technical and personal
B)administrative and personal
C)technical and administrative
D)technical and financial
سؤال
During the buildup phase,the project goals,in order of importance,are __________.

A)schedule,scope,cost
B)cost,schedule,scope
C)schedule,cost,scope
D)cost,scope,schedule
سؤال
According to the textbook,in Latin America,the __________ system leads a manager to give preference to relatives and friends when hiring.

A)amigo
B)compadre
C)counterpart
D)diablo
سؤال
__________ is the entire way of life for a group of people.It contains the four elements of technology,institutions,language,and arts.

A)Management
B)Systemic living
C)Nomadic living
D)Culture
سؤال
Projects are conducted in four important environments.They are __________.

A)economic,political,legal,and sociotechnical
B)internal,external,transitional,and multicultural
C)routine,unique,fast-paced,and complex
D)profit,not for profit,government,and industry
سؤال
According to the authors,of all the characteristics desirable in a project manager,__________ is the most important.

A)availability
B)a strong technical background
C)ability to keep the project team happy
D)drive to complete the task
سؤال
The structure of a society is determined by its __________.

A)institutions
B)wages
C)jobs
D)enemies
سؤال
Three approaches are paramount for handling complex projects.Which of the following is not one of those approaches?

A)Communicating effectively with all stakeholder groups
B)Skill with Microsoft Project or other similar software
C)Learn as much about the client as possible
D)Leadership
سؤال
Which of the following is not a phase in the Tuckman ladder?

A)forming
B)defining
C)norming
D)mourning
سؤال
A project manager must make trade-off decisions between the project,the firm,and _____.

A)other projects
B)their own career goals
C)demands of the functional managers
D)completion time for the project
سؤال
According to the authors,the key to coping with uncertainty at the end of a project (a common obstacle for project managers)is __________.

A)discipline
B)communication
C)planning
D)supervision
سؤال
The project manager must make trade-offs between project progress and process.Conceptually,this involves trade-offs between the __________ functions.

A)technical and managerial
B)schedule and cost
C)performance and schedule
D)cost and performance
سؤال
Identify three important characteristics that would be desirable in a project manager.Explain your reasoning.
سؤال
Listed below are three aspects of leadership.Match them with their associated competencies.

A)Intellectual quality
B)Managerial quality
C)Emotional quality
1)Engaging communication,managing resources,empowering,developing,and achieving
2)Self-awareness,emotional resilience,motivation,sensitivity,influence,intuitiveness,conscientiousness
3)Critical analysis and judgment,vision and imagination,and strategic perspective
سؤال
The __________ is an alternative action if the expected result fails to materialize.

A)trade-off
B)system plan
C)feedback
D)contingency plan
سؤال
The __________ represents everything outside the system that delivers inputs or receives outputs from the system.

A)environment
B)feedback
C)culture
D)system
سؤال
The Tuckman ladder suggest that teams progress through four development phases.Those phases are listed below.Match each phase with its description.

A)Forming
B)Storming
C)Norming
D)Performing
1)Teams function as a cohesive unit focused on accomplishing the goals of the project.
2)Team members come together for the first time and begin learning about their roles and responsibilities.
3)In this phase,the team members begin to establish team norms and team cohesiveness develops.Individual team members reconcile their behaviors to support the overall team,and trust develops.
4)Work on the project begins,but initially the team members tend to work independently,which often leads to conflict.
سؤال
The __________ is the "corporate culture" within the organization,or even within the project.

A)cultural anomaly
B)microculture
C)multiculture
D)interfirm culture
سؤال
The __________ is a person who spearheads an idea or action and sells it throughout the organization.

A)stakeholder
B)champion
C)interviewer
D)coach
سؤال
Compare and contrast the analytic and systems approaches.As part of your answer,be sure to indicate which part of project leadership is likely to use each approach.
سؤال
At the inception of a project,crises tend to be associated with resources.Explain why this scenario could be common in some organizations.
سؤال
The project manager makes a __________ by allowing one aspect of the project to get worse in return for allowing another aspect of the project to get better.

A)decision
B)turnaround
C)trade-off
D)chart
سؤال
Compare and contrast a functional manager with a project manager.
سؤال
Match these terms with their meanings.

A)Analytic approach
B)Systems approach
C)Champion
D)Facilitator
1)A wide-ranging,synthesizing method for addressing problems that considers multiple and interacting relationships
2)A person who helps people overcome problems,either with technical issues or with other people
3)Breaking problems into their constituent parts to understand the parts better and thereby solve the problem
4)A person who spearheads an idea or action and "sells" it throughout the organization
سؤال
When asked,"How do you motivate astronauts?" a representative of NASA responded,"We don't motivate them,but,boy,are we careful about whom we select." Discuss the implications of this statement for project managers seeking to motivate project team members.
سؤال
A __________ is a person who helps people overcome problems,either with technical issues or with other people.

A)problem solver
B)stakeholder
C)synthesizer
D)facilitator
سؤال
With respect to acquiring resources,there is a high potential for conflict between the functional manager and the project manager.Describe a major source of that conflict and suggest how it can be managed properly.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: The Project Manager
1
The project manager should be more skilled at __________,whereas the functional manager should be more skilled at __________.

A)synthesis; analysis
B)analysis; synthesis
C)communication; managing
D)managing,analysis
A
2
The project manager's responsibility to the project and to the client is met by ensuring that the __________ of the project is preserved in spite of conflicting demands made by stakeholders.

A)management
B)integrity
C)analysis
D)synthesis
B
3
What is scope creep?

A)A change in the budget for the project
B)A reduction in what is required for the project in order to reduce the budget
C)A change in what is required for the project
D)A change in the budget for the project
D
4
The __________ states that to understand the system,we must understand the environment (or larger system)of which it is a part.

A)systems approach
B)cultural awareness
C)systemic congruence
D)project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
5
How are most of the workers on a project acquired?

A)Temporary agencies
B)Borrowed from functional departments
C)Transferred from functional departments
D)Subcontractors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
6
According to the authors,three major questions face the project manager with respect to synthesizing the requirements of a project.Identify the item that is not listed as one of the three major questions.

A)What needs to be done?
B)Who will actually do the work of the project?
C)When must it be done?
D)How will the required resources be obtained?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
7
According to the authors,the analytic method,when applied to systems,focuses on __________.

A)assembling the components of a system into an integrated package
B)building an array of individually designed and manufactured components
C)calculating the cost and schedule requirements
D)dividing the components of a system into smaller and smaller elements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is not an important characteristic for effective team members?

A)High-quality technical skills
B)Political,and general,sensitivity
C)High self-esteem
D)Strong sense of self
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
9
According to the authors the project manager should be more skilled at __________.

A)general management
B)technology
C)synthesis
D)analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is not typically recommended to be considered when hiring new team members?

A)high-quality technical skills
B)political,and general,sensitivity
C)strong goal orientation
D)low self-esteem
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
11
The Project Management Institute (PMI)offers a certification for project managers.PMI offers examination for certification as __________.

A)Project Management Professionals
B)Project Management Experts
C)Project Management Associates
D)Project Management Engineers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
12
The project manager's responsibilities are broad and fall primarily into three separate areas.Responsibilities to _____________ is not one of these.

A)the parent organization
B)the project and the client
C)the members of the project team
D)special-interest groups
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
13
Identify the attribute that is not normally associated with the job of functional manager.

A)The functional manager is usually a generalist in the area being managed.
B)The functional manager is responsible for deciding what resources will be devoted to accomplishing the task.
C)The functional manager is administratively responsible for deciding how something will be done.
D)The functional manager is responsible for deciding who will do the work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is one of the most serious crises for the project manager?

A)Change in the budget for a project
B)A key worker leaving the project
C)A technical issue
D)Change in required project scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
15
The ideal project manager should be __________.

A)a direct,technical supervisor knowledgeable in the technology of the process being used
B)both generalist / facilitator and have a high level of technical competence in the science of the project
C)a facilitator and specialist with technical credibility
D)a technical specialist competent in principles of robust design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
16
___________ is when someone takes over the project manager's job by exercising extremely close supervision over every action the project manager takes,or will actually tell the project manager precisely what to do.

A)Micromanagement
B)Over-management
C)Turnover
D)Supermanagement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
17
Research has shown that the chances for successful completion of a multidisciplinary project are greatly increased if project team members are _____ rather than _______,

A)problem-oriented; discipline-oriented
B)discipline-oriented; problem-oriented
C)problem-oriented; management-oriented
D)management-oriented; problem-oriented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
18
Resources initially budgeted for a project are frequently __________ for the task,partly because of natural optimism by the proposer about how many resources are needed.

A)sufficient
B)delayed
C)insufficient
D)hindrances
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
19
The functional manager uses the __________ approach and the PM uses the __________ approach.

A)systems; analytic
B)numerical; nonnumeric
C)analytic; systems
D)nonnumeric; numerical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
20
When managing a project,the project manager is responsible for __________.

A)auditing the project
B)executing the project
C)budgeting the project
D)designing the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
21
During the final or phaseout stage of the project lifecycle,__________ is the dominant goal of many project managers.

A)schedule
B)cost
C)scope
D)quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
22
__________ result(s)when the demands made on an individual are greater than the person's ability to cope with them,particularly when the person has a high need for achievement.

A)Stress
B)Culture
C)Balance
D)Contingency plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
23
The ability to sense conflict early,then confront and deal with it before the conflict escalates into interdepartmental and intradepartmental warfare is which of the following attributes?

A)credibility
B)sensitivity
C)competency
D)ability to handle stress
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
24
In order to meet the demands of the job of project manager-acquiring adequate resources,acquiring and motivating personnel,dealing with obstacles,making project goal trade-offs,maintaining a balanced outlook,and establishing a broad network of communication-the project manager must be a(n)_______________.

A)highly skilled negotiator
B)hard worker
C)effective budgeter
D)cultural expert
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
25
Most of the time spent by a project manager is spent __________.

A)attending technical workshops
B)overseeing the workforce
C)filing paperwork
D)communicating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
26
During the buildup stage of a project life cycle,__________ is the dominant goal of many project managers.

A)schedule
B)cost
C)scope
D)quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
27
During the __________ stage of the project lifecycle,there is no significant difference in the importance that project managers place on the three goals of cost,time,and scope.

A)main
B)formation
C)buildup
D)phaseout
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
28
Project managers must have __________,which refers to possessing enough technical abilities to direct the project.

A)technical credibility
B)managerial credibility
C)negotiation skill
D)drive to complete the task
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
29
The project manager needs __________ credibility.

A)technical and personal
B)administrative and personal
C)technical and administrative
D)technical and financial
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
30
During the buildup phase,the project goals,in order of importance,are __________.

A)schedule,scope,cost
B)cost,schedule,scope
C)schedule,cost,scope
D)cost,scope,schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
31
According to the textbook,in Latin America,the __________ system leads a manager to give preference to relatives and friends when hiring.

A)amigo
B)compadre
C)counterpart
D)diablo
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
32
__________ is the entire way of life for a group of people.It contains the four elements of technology,institutions,language,and arts.

A)Management
B)Systemic living
C)Nomadic living
D)Culture
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
33
Projects are conducted in four important environments.They are __________.

A)economic,political,legal,and sociotechnical
B)internal,external,transitional,and multicultural
C)routine,unique,fast-paced,and complex
D)profit,not for profit,government,and industry
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
34
According to the authors,of all the characteristics desirable in a project manager,__________ is the most important.

A)availability
B)a strong technical background
C)ability to keep the project team happy
D)drive to complete the task
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
35
The structure of a society is determined by its __________.

A)institutions
B)wages
C)jobs
D)enemies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
36
Three approaches are paramount for handling complex projects.Which of the following is not one of those approaches?

A)Communicating effectively with all stakeholder groups
B)Skill with Microsoft Project or other similar software
C)Learn as much about the client as possible
D)Leadership
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following is not a phase in the Tuckman ladder?

A)forming
B)defining
C)norming
D)mourning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
38
A project manager must make trade-off decisions between the project,the firm,and _____.

A)other projects
B)their own career goals
C)demands of the functional managers
D)completion time for the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
39
According to the authors,the key to coping with uncertainty at the end of a project (a common obstacle for project managers)is __________.

A)discipline
B)communication
C)planning
D)supervision
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
40
The project manager must make trade-offs between project progress and process.Conceptually,this involves trade-offs between the __________ functions.

A)technical and managerial
B)schedule and cost
C)performance and schedule
D)cost and performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
41
Identify three important characteristics that would be desirable in a project manager.Explain your reasoning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
42
Listed below are three aspects of leadership.Match them with their associated competencies.

A)Intellectual quality
B)Managerial quality
C)Emotional quality
1)Engaging communication,managing resources,empowering,developing,and achieving
2)Self-awareness,emotional resilience,motivation,sensitivity,influence,intuitiveness,conscientiousness
3)Critical analysis and judgment,vision and imagination,and strategic perspective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
43
The __________ is an alternative action if the expected result fails to materialize.

A)trade-off
B)system plan
C)feedback
D)contingency plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
44
The __________ represents everything outside the system that delivers inputs or receives outputs from the system.

A)environment
B)feedback
C)culture
D)system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
45
The Tuckman ladder suggest that teams progress through four development phases.Those phases are listed below.Match each phase with its description.

A)Forming
B)Storming
C)Norming
D)Performing
1)Teams function as a cohesive unit focused on accomplishing the goals of the project.
2)Team members come together for the first time and begin learning about their roles and responsibilities.
3)In this phase,the team members begin to establish team norms and team cohesiveness develops.Individual team members reconcile their behaviors to support the overall team,and trust develops.
4)Work on the project begins,but initially the team members tend to work independently,which often leads to conflict.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
46
The __________ is the "corporate culture" within the organization,or even within the project.

A)cultural anomaly
B)microculture
C)multiculture
D)interfirm culture
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
47
The __________ is a person who spearheads an idea or action and sells it throughout the organization.

A)stakeholder
B)champion
C)interviewer
D)coach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
48
Compare and contrast the analytic and systems approaches.As part of your answer,be sure to indicate which part of project leadership is likely to use each approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
49
At the inception of a project,crises tend to be associated with resources.Explain why this scenario could be common in some organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
50
The project manager makes a __________ by allowing one aspect of the project to get worse in return for allowing another aspect of the project to get better.

A)decision
B)turnaround
C)trade-off
D)chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
51
Compare and contrast a functional manager with a project manager.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
52
Match these terms with their meanings.

A)Analytic approach
B)Systems approach
C)Champion
D)Facilitator
1)A wide-ranging,synthesizing method for addressing problems that considers multiple and interacting relationships
2)A person who helps people overcome problems,either with technical issues or with other people
3)Breaking problems into their constituent parts to understand the parts better and thereby solve the problem
4)A person who spearheads an idea or action and "sells" it throughout the organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
53
When asked,"How do you motivate astronauts?" a representative of NASA responded,"We don't motivate them,but,boy,are we careful about whom we select." Discuss the implications of this statement for project managers seeking to motivate project team members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
54
A __________ is a person who helps people overcome problems,either with technical issues or with other people.

A)problem solver
B)stakeholder
C)synthesizer
D)facilitator
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
55
With respect to acquiring resources,there is a high potential for conflict between the functional manager and the project manager.Describe a major source of that conflict and suggest how it can be managed properly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.