Deck 13: Project Management

ملء الشاشة (f)
exit full mode
سؤال
Issues of cultural diversity in project management should only be addressed if and when they arise.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A work breakdown structure provides a common understanding of and justification for a project.
سؤال
The three primary elements of project management include planning,scheduling,and costing.
سؤال
A unique,one-time operational activity or effort is referred to as a process.
سؤال
A typical project team is cross-functional consisting of members throughout an organization.
سؤال
Management and control of a companywide portfolio of projects is known as enterprise project management.
سؤال
The principles of total quality management (TQM)cannot be applied to project management.
سؤال
Managing quality is not an important part of project management.
سؤال
Asian cultures tend to embrace project management's methodical approach more than western cultures.
سؤال
Project scheduling is recognized as the most critical element in the project management process.
سؤال
Global projects are rarely concerned with cultural differences among team members because English is the universal business language.
سؤال
Control,one of the basic elements of a project plan,involves a set of procedures for monitoring and evaluating progress and performance.
سؤال
Earned value analysis reports a project's performance by tracking its forecasted completion date and anticipated budget variations.
سؤال
A Gantt chart provides a visual display of the project schedule that includes scheduled start times,finish times,and available slack.
سؤال
Project control involves monitoring a project and measuring its progress toward a successful completion.
سؤال
Project scope,one of the basic elements of a project plan,involves a set of procedures for anticipating and assessing uncertainties that might increase the risk of delaying the project.
سؤال
The upper level of a work breakdown structure for a project highlights summary activities and/or major components.
سؤال
Two key elements of project control are time management and cost management.
سؤال
Enterprise project management refers to the management and control of a large,complex project.
سؤال
In general,projects are subject to less uncertainty than other types of processes.
سؤال
In general,crashing costs decrease as a project's duration is systematically reduced to a target value.
سؤال
The earliest start time for the first activity in a project is generally at time zero.
سؤال
Slack represents the amount of time an activity can be delayed without delaying the project completion time.
سؤال
A dummy variable is an activity inserted into the AOA network diagram to show a precedence relationship,but does not represent any passage of time.
سؤال
Microsoft Project is a software package that supports CPM/PERT analysis.
سؤال
A project's duration can be reduced by crashing activities on the critical path.
سؤال
Crashing activities with positive slack reduces a project's duration.
سؤال
Which of the following is not a basic element in a project plan?

A)Objectives
B)Personnel
C)Contract requirements
D)All of these answer choices are correct.
سؤال
Unlike PERT,CPM incorporates probabilistic time estimates into the project management process.
سؤال
The project management process encompasses

A)planning.
B)scheduling.
C)control.
D)All of these answer choices are correct.
سؤال
Because the critical path is the shortest path through a network,it defines the project completion time.
سؤال
A(n)______________ breaks down a project into components,subcomponents,activities,and tasks.

A)work breakdown structure (WBS)
B)scope statement
C)responsibility assignment matrix (RAM)
D)organizational breakdown structure (OBS)
سؤال
The _______________ is a document that provides a common understanding,justification,and expected result for a project.

A)statement of work
B)work breakdown structure
C)scope statement
D)responsibility assignment matrix
سؤال
Which of the following is not a general characteristic of a project?

A)a project has a unique purpose
B)a project has more certainty
C)a project has more uncertainty
D)a project often draws resources from various areas in the organization
سؤال
With an activity-on-node (AON)network diagram,the nodes indicate the precedence relationships and the arrows represent the project's activities.
سؤال
PERT stands for program enterprise and resource technique.
سؤال
A(n)_______________ is a project team structure that includes members from different functional areas.

A)matrix organization
B)project network
C)organizational breakdown structure
D)work breakdown structure
سؤال
The critical path is the longest path through the project's network.
سؤال
Indirect costs always increase as a project's duration increases.
سؤال
Activities that are not on a project's critical path have zero slack.
سؤال
Diversity among project team members brings different

A)views.
B)experiences.
C)values.
D)All of these answer choices are correct.
سؤال
The single most important criterion for the success of many projects is that

A)it be finished on time.
B)the quality meet minimum standards.
C)the costs are minimized.
D)None of these answer choices is correct.
سؤال
Which area of the world takes a lot of holidays potentially impacting project schedules?

A)Asia.
B)Southern Europe
C)North America
D)None of these answer choices is correct.
سؤال
In general,the latest finish time for an activity is equal to

A)latest finish time minus the activity time estimate.
B)the minimum of the latest start times for the activities that immediately follow.
C)the maximum of the latest start times for the activities that immediately follow.
D)the average of the latest start times for the activities that immediately follow.
سؤال
Which area of the world employs a more methodically approach to business that values patience and relationship building?

A)Asia.
B)Southern Europe
C)North America
D)None of these answer choices is correct.
سؤال
A standard procedure for numerically measuring a project's progress is referred to as

A)program evaluation and review technique (PERT).
B)critical path method (CPM).
C)Gantt chart.
D)earned value analysis.
سؤال
In general,the earliest finish time for an activity is equal to

A)earliest start time + activity time estimate.
B)earliest start time - activity time estimate.
C)earliest start time - slack time.
D)earliest start time + slack time.
سؤال
Project managers must address cultural diversity in

A)project planning
B)project scheduling.
C)project control.
D)None of these answer choices is correct.
سؤال
Which of the following is one of the oldest and most widely used scheduling technique?

A)PERT
B)CPM
C)Gantt
D)Microsoft Project
سؤال
The key elements of project control include all the following except

A)time management.
B)cost management.
C)material management.
D)communication.
سؤال
Which of the following is not used to calculate probabilistic time estimates?

A)optimistic
B)most likely
C)least likely
D)pessimistic
سؤال
A bar graph displaying when activities are scheduled to start,when they will be finished,and where extra time is available is known as a

A)PERT chart.
B)work breakdown structure (WBS).
C)Gantt chart.
D)responsibility assignment matrix (RAM).
سؤال
In project management the term slack refers to the amount of time

A)to complete an activity without delaying the project.
B)an activity can be delayed without delaying the project.
C)needed to complete the entire project.
D)required to complete the project's critical activities.
سؤال
The longest path through a project network is referred to as the

A)activity-on-node path.
B)path of greatest slack.
C)critical path.
D)noncritical path.
سؤال
For an activity-on-node (AON)network,

A)arrows represent activities and nodes represent events.
B)nodes represent activities and arrows indicate precedence relationships.
C)arrows represent events and nodes indicate precedence relationships.
D)nodes indicate precedence relationships and arrows indicates the length of the activity time.
سؤال
_______________ relationship is the sequential relationship of project activities to each other.

A)Precedence
B)Scheduling
C)Slack
D)Prior
سؤال
One disadvantage of Gantt charts,especially for large projects,is that it does not

A)clearly show precedence relationships.
B)indicate activity start times.
C)indicate activity finish times.
D)use bars to represent activities.
سؤال
Which of the following is not one of the basic steps involved in developing a schedule?

A)define the activities
B)sequence the activities
C)estimate the time required to complete each activity
D)identify the project cost
سؤال
Which of the following is the universal business language most often utilized when managing global projects?

A)French
B)Spanish
C)English
D)Chinese
سؤال
________________ is the process of making sure a project progresses to a successful completion.

A)Project planning
B)Project scheduling
C)Project control
D)None of these answer choices is correct.
سؤال
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the earliest finish (EF)time for activity D is</strong> A)7 weeks. B)13 weeks. C)20 weeks. D)30 weeks. <div style=padding-top: 35px> Table XX
Using Table XX,the earliest finish (EF)time for activity D is

A)7 weeks.
B)13 weeks.
C)20 weeks.
D)30 weeks.
سؤال
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the latest start (LS)time for activity D is</strong> A)8 days. B)11 days. C)19 days. D)12 days. <div style=padding-top: 35px> Table YY
Using Table YY,the latest start (LS)time for activity D is

A)8 days.
B)11 days.
C)19 days.
D)12 days.
سؤال
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the critical path for this project is</strong> A)A-B-C. B)A-C-D. C)A-B-D. D)A-B-C-D. <div style=padding-top: 35px> Table YY
Using Table YY,the critical path for this project is

A)A-B-C.
B)A-C-D.
C)A-B-D.
D)A-B-C-D.
سؤال
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the amount of slack associated with activity C is</strong> A)4 days. B)3 days. C)2 days. D)1 day. <div style=padding-top: 35px> Table YY
Using Table YY,the amount of slack associated with activity C is

A)4 days.
B)3 days.
C)2 days.
D)1 day.
سؤال
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the time complete the entire project is</strong> A)20 weeks. B)30 weeks. C)36 weeks. D)39 weeks. <div style=padding-top: 35px> Table XX
Using Table XX,the time complete the entire project is

A)20 weeks.
B)30 weeks.
C)36 weeks.
D)39 weeks.
سؤال
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the time to complete the entire project would be</strong> A)23 days. B)19 days. C)17 days. D)11 days. <div style=padding-top: 35px> Table YY
Using Table YY,the time to complete the entire project would be

A)23 days.
B)19 days.
C)17 days.
D)11 days.
سؤال
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the earliest finish (EF)time for activity C is</strong> A)4 days. B)6 days. C)10 days. D)11 days. <div style=padding-top: 35px> Table YY
Using Table YY,the earliest finish (EF)time for activity C is

A)4 days.
B)6 days.
C)10 days.
D)11 days.
سؤال
The _______________ probability distribution is typically used to describe uncertain activity times in a project.

A)beta
B)normal
C)binomial
D)exponential
سؤال
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the earliest start (ES)time for activity B is</strong> A)5 days. B)6 days. C)11 days. D)14 days. <div style=padding-top: 35px> Table YY
Using Table YY,the earliest start (ES)time for activity B is

A)5 days.
B)6 days.
C)11 days.
D)14 days.
سؤال
The following table of probabilistic time estimates (in weeks)and activity predecessors are provided for a project.
<strong>The following table of probabilistic time estimates (in weeks)and activity predecessors are provided for a project.   Table ZZ Using Table ZZ,the expected time to complete activity A is</strong> A)5.00 weeks. B)7.33 weeks. C)7.67 weeks. D)8.00 weeks. <div style=padding-top: 35px> Table ZZ
Using Table ZZ,the expected time to complete activity A is

A)5.00 weeks.
B)7.33 weeks.
C)7.67 weeks.
D)8.00 weeks.
سؤال
The estimated variance for an activity with a most likely time (m)equal to 12 weeks,an optimistic time (a)equal to 9 weeks,and a pessimistic time (b)equal to 18 weeks is

A)3.75 weeks.
B)1.50 weeks.
C)5.25 weeks.
D)0.25 weeks.
سؤال
The slack time for an activity can be computed as

A)latest start time (LS)- latest finish time (LF).
B)earliest start time (ES)+ earliest finish time (EF).
C)latest start time (LS)- earliest start time (ES).
D)latest finish time (LF)+ earliest finish time (EF).
سؤال
The estimated variance for an activity with a most likely time (m)equal to 11 days,the optimistic time (a)equal to 6 days,and the pessimistic time (b)equal to 18 days is

A)2 days.
B)4 days.
C)6 days.
D)11 days.
سؤال
The estimated mean time for an activity with a most likely time (m)equal to 12 weeks,an optimistic time (a)equal to 9 weeks,and a pessimistic time (b)equal to 18 weeks is

A)13.0 weeks.
B)12.75 weeks.
C)12.5 weeks.
D)9.0 weeks.
سؤال
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the earliest start time for activity F is</strong> A)30 weeks. B)20 weeks. C)14 weeks. D)13 weeks. <div style=padding-top: 35px> Table XX
Using Table XX,the earliest start time for activity F is

A)30 weeks.
B)20 weeks.
C)14 weeks.
D)13 weeks.
سؤال
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the latest start (LS)time for activity B is</strong> A)5 weeks. B)8 weeks. C)13 weeks. D)14 weeks. <div style=padding-top: 35px> Table XX
Using Table XX,the latest start (LS)time for activity B is

A)5 weeks.
B)8 weeks.
C)13 weeks.
D)14 weeks.
سؤال
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the amount of slack associated with activity C is</strong> A)0 weeks. B)3 weeks. C)6 weeks. D)None of these answer choices is correct. <div style=padding-top: 35px> Table XX
Using Table XX,the amount of slack associated with activity C is

A)0 weeks.
B)3 weeks.
C)6 weeks.
D)None of these answer choices is correct.
سؤال
The estimated mean time for an activity with a most likely time (m)equal to 11 days,the optimistic time (a)equal to 6 days,and the pessimistic time (b)equal to 18 days is

A)9.67 days.
B)11 days.
C)11.33 days.
D)11.67 days.
سؤال
For activities on a project's critical path,

A)earliest start time (ES)equals latest start time (LS).
B)earliest start time (ES)is greater than latest start time (LS).
C)earliest start time (ES)is less than latest start time (LS).
D)earliest start time (ES)equals latest finish time (LF).
سؤال
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the critical path for this project consists of activities</strong> A)A-B-C-D-E-F. B)A-C-E-F. C)A-B-C-F. D)A-B-D-F. <div style=padding-top: 35px> Table XX
Using Table XX,the critical path for this project consists of activities

A)A-B-C-D-E-F.
B)A-C-E-F.
C)A-B-C-F.
D)A-B-D-F.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/98
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Project Management
1
Issues of cultural diversity in project management should only be addressed if and when they arise.
False
2
A work breakdown structure provides a common understanding of and justification for a project.
False
3
The three primary elements of project management include planning,scheduling,and costing.
False
4
A unique,one-time operational activity or effort is referred to as a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
5
A typical project team is cross-functional consisting of members throughout an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
6
Management and control of a companywide portfolio of projects is known as enterprise project management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
7
The principles of total quality management (TQM)cannot be applied to project management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
8
Managing quality is not an important part of project management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
9
Asian cultures tend to embrace project management's methodical approach more than western cultures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
10
Project scheduling is recognized as the most critical element in the project management process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
11
Global projects are rarely concerned with cultural differences among team members because English is the universal business language.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
12
Control,one of the basic elements of a project plan,involves a set of procedures for monitoring and evaluating progress and performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
13
Earned value analysis reports a project's performance by tracking its forecasted completion date and anticipated budget variations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
14
A Gantt chart provides a visual display of the project schedule that includes scheduled start times,finish times,and available slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
15
Project control involves monitoring a project and measuring its progress toward a successful completion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
16
Project scope,one of the basic elements of a project plan,involves a set of procedures for anticipating and assessing uncertainties that might increase the risk of delaying the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
17
The upper level of a work breakdown structure for a project highlights summary activities and/or major components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
18
Two key elements of project control are time management and cost management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
19
Enterprise project management refers to the management and control of a large,complex project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
20
In general,projects are subject to less uncertainty than other types of processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
21
In general,crashing costs decrease as a project's duration is systematically reduced to a target value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
22
The earliest start time for the first activity in a project is generally at time zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
23
Slack represents the amount of time an activity can be delayed without delaying the project completion time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
24
A dummy variable is an activity inserted into the AOA network diagram to show a precedence relationship,but does not represent any passage of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
25
Microsoft Project is a software package that supports CPM/PERT analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
26
A project's duration can be reduced by crashing activities on the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
27
Crashing activities with positive slack reduces a project's duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which of the following is not a basic element in a project plan?

A)Objectives
B)Personnel
C)Contract requirements
D)All of these answer choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
29
Unlike PERT,CPM incorporates probabilistic time estimates into the project management process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
30
The project management process encompasses

A)planning.
B)scheduling.
C)control.
D)All of these answer choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
31
Because the critical path is the shortest path through a network,it defines the project completion time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
32
A(n)______________ breaks down a project into components,subcomponents,activities,and tasks.

A)work breakdown structure (WBS)
B)scope statement
C)responsibility assignment matrix (RAM)
D)organizational breakdown structure (OBS)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
33
The _______________ is a document that provides a common understanding,justification,and expected result for a project.

A)statement of work
B)work breakdown structure
C)scope statement
D)responsibility assignment matrix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is not a general characteristic of a project?

A)a project has a unique purpose
B)a project has more certainty
C)a project has more uncertainty
D)a project often draws resources from various areas in the organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
35
With an activity-on-node (AON)network diagram,the nodes indicate the precedence relationships and the arrows represent the project's activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
36
PERT stands for program enterprise and resource technique.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
37
A(n)_______________ is a project team structure that includes members from different functional areas.

A)matrix organization
B)project network
C)organizational breakdown structure
D)work breakdown structure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
38
The critical path is the longest path through the project's network.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
39
Indirect costs always increase as a project's duration increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
40
Activities that are not on a project's critical path have zero slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
41
Diversity among project team members brings different

A)views.
B)experiences.
C)values.
D)All of these answer choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
42
The single most important criterion for the success of many projects is that

A)it be finished on time.
B)the quality meet minimum standards.
C)the costs are minimized.
D)None of these answer choices is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which area of the world takes a lot of holidays potentially impacting project schedules?

A)Asia.
B)Southern Europe
C)North America
D)None of these answer choices is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
44
In general,the latest finish time for an activity is equal to

A)latest finish time minus the activity time estimate.
B)the minimum of the latest start times for the activities that immediately follow.
C)the maximum of the latest start times for the activities that immediately follow.
D)the average of the latest start times for the activities that immediately follow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which area of the world employs a more methodically approach to business that values patience and relationship building?

A)Asia.
B)Southern Europe
C)North America
D)None of these answer choices is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
46
A standard procedure for numerically measuring a project's progress is referred to as

A)program evaluation and review technique (PERT).
B)critical path method (CPM).
C)Gantt chart.
D)earned value analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
47
In general,the earliest finish time for an activity is equal to

A)earliest start time + activity time estimate.
B)earliest start time - activity time estimate.
C)earliest start time - slack time.
D)earliest start time + slack time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
48
Project managers must address cultural diversity in

A)project planning
B)project scheduling.
C)project control.
D)None of these answer choices is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following is one of the oldest and most widely used scheduling technique?

A)PERT
B)CPM
C)Gantt
D)Microsoft Project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
50
The key elements of project control include all the following except

A)time management.
B)cost management.
C)material management.
D)communication.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is not used to calculate probabilistic time estimates?

A)optimistic
B)most likely
C)least likely
D)pessimistic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
52
A bar graph displaying when activities are scheduled to start,when they will be finished,and where extra time is available is known as a

A)PERT chart.
B)work breakdown structure (WBS).
C)Gantt chart.
D)responsibility assignment matrix (RAM).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
53
In project management the term slack refers to the amount of time

A)to complete an activity without delaying the project.
B)an activity can be delayed without delaying the project.
C)needed to complete the entire project.
D)required to complete the project's critical activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
54
The longest path through a project network is referred to as the

A)activity-on-node path.
B)path of greatest slack.
C)critical path.
D)noncritical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
55
For an activity-on-node (AON)network,

A)arrows represent activities and nodes represent events.
B)nodes represent activities and arrows indicate precedence relationships.
C)arrows represent events and nodes indicate precedence relationships.
D)nodes indicate precedence relationships and arrows indicates the length of the activity time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
56
_______________ relationship is the sequential relationship of project activities to each other.

A)Precedence
B)Scheduling
C)Slack
D)Prior
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
57
One disadvantage of Gantt charts,especially for large projects,is that it does not

A)clearly show precedence relationships.
B)indicate activity start times.
C)indicate activity finish times.
D)use bars to represent activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following is not one of the basic steps involved in developing a schedule?

A)define the activities
B)sequence the activities
C)estimate the time required to complete each activity
D)identify the project cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following is the universal business language most often utilized when managing global projects?

A)French
B)Spanish
C)English
D)Chinese
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
60
________________ is the process of making sure a project progresses to a successful completion.

A)Project planning
B)Project scheduling
C)Project control
D)None of these answer choices is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
61
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the earliest finish (EF)time for activity D is</strong> A)7 weeks. B)13 weeks. C)20 weeks. D)30 weeks. Table XX
Using Table XX,the earliest finish (EF)time for activity D is

A)7 weeks.
B)13 weeks.
C)20 weeks.
D)30 weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
62
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the latest start (LS)time for activity D is</strong> A)8 days. B)11 days. C)19 days. D)12 days. Table YY
Using Table YY,the latest start (LS)time for activity D is

A)8 days.
B)11 days.
C)19 days.
D)12 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
63
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the critical path for this project is</strong> A)A-B-C. B)A-C-D. C)A-B-D. D)A-B-C-D. Table YY
Using Table YY,the critical path for this project is

A)A-B-C.
B)A-C-D.
C)A-B-D.
D)A-B-C-D.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
64
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the amount of slack associated with activity C is</strong> A)4 days. B)3 days. C)2 days. D)1 day. Table YY
Using Table YY,the amount of slack associated with activity C is

A)4 days.
B)3 days.
C)2 days.
D)1 day.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
65
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the time complete the entire project is</strong> A)20 weeks. B)30 weeks. C)36 weeks. D)39 weeks. Table XX
Using Table XX,the time complete the entire project is

A)20 weeks.
B)30 weeks.
C)36 weeks.
D)39 weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
66
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the time to complete the entire project would be</strong> A)23 days. B)19 days. C)17 days. D)11 days. Table YY
Using Table YY,the time to complete the entire project would be

A)23 days.
B)19 days.
C)17 days.
D)11 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
67
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the earliest finish (EF)time for activity C is</strong> A)4 days. B)6 days. C)10 days. D)11 days. Table YY
Using Table YY,the earliest finish (EF)time for activity C is

A)4 days.
B)6 days.
C)10 days.
D)11 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
68
The _______________ probability distribution is typically used to describe uncertain activity times in a project.

A)beta
B)normal
C)binomial
D)exponential
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
69
A project consists of the following four activities with activity times in days:
<strong>A project consists of the following four activities with activity times in days:   Table YY Using Table YY,the earliest start (ES)time for activity B is</strong> A)5 days. B)6 days. C)11 days. D)14 days. Table YY
Using Table YY,the earliest start (ES)time for activity B is

A)5 days.
B)6 days.
C)11 days.
D)14 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
70
The following table of probabilistic time estimates (in weeks)and activity predecessors are provided for a project.
<strong>The following table of probabilistic time estimates (in weeks)and activity predecessors are provided for a project.   Table ZZ Using Table ZZ,the expected time to complete activity A is</strong> A)5.00 weeks. B)7.33 weeks. C)7.67 weeks. D)8.00 weeks. Table ZZ
Using Table ZZ,the expected time to complete activity A is

A)5.00 weeks.
B)7.33 weeks.
C)7.67 weeks.
D)8.00 weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
71
The estimated variance for an activity with a most likely time (m)equal to 12 weeks,an optimistic time (a)equal to 9 weeks,and a pessimistic time (b)equal to 18 weeks is

A)3.75 weeks.
B)1.50 weeks.
C)5.25 weeks.
D)0.25 weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
72
The slack time for an activity can be computed as

A)latest start time (LS)- latest finish time (LF).
B)earliest start time (ES)+ earliest finish time (EF).
C)latest start time (LS)- earliest start time (ES).
D)latest finish time (LF)+ earliest finish time (EF).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
73
The estimated variance for an activity with a most likely time (m)equal to 11 days,the optimistic time (a)equal to 6 days,and the pessimistic time (b)equal to 18 days is

A)2 days.
B)4 days.
C)6 days.
D)11 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
74
The estimated mean time for an activity with a most likely time (m)equal to 12 weeks,an optimistic time (a)equal to 9 weeks,and a pessimistic time (b)equal to 18 weeks is

A)13.0 weeks.
B)12.75 weeks.
C)12.5 weeks.
D)9.0 weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
75
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the earliest start time for activity F is</strong> A)30 weeks. B)20 weeks. C)14 weeks. D)13 weeks. Table XX
Using Table XX,the earliest start time for activity F is

A)30 weeks.
B)20 weeks.
C)14 weeks.
D)13 weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
76
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the latest start (LS)time for activity B is</strong> A)5 weeks. B)8 weeks. C)13 weeks. D)14 weeks. Table XX
Using Table XX,the latest start (LS)time for activity B is

A)5 weeks.
B)8 weeks.
C)13 weeks.
D)14 weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
77
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the amount of slack associated with activity C is</strong> A)0 weeks. B)3 weeks. C)6 weeks. D)None of these answer choices is correct. Table XX
Using Table XX,the amount of slack associated with activity C is

A)0 weeks.
B)3 weeks.
C)6 weeks.
D)None of these answer choices is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
78
The estimated mean time for an activity with a most likely time (m)equal to 11 days,the optimistic time (a)equal to 6 days,and the pessimistic time (b)equal to 18 days is

A)9.67 days.
B)11 days.
C)11.33 days.
D)11.67 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
79
For activities on a project's critical path,

A)earliest start time (ES)equals latest start time (LS).
B)earliest start time (ES)is greater than latest start time (LS).
C)earliest start time (ES)is less than latest start time (LS).
D)earliest start time (ES)equals latest finish time (LF).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
80
A project consists of the following activities:
<strong>A project consists of the following activities:   Table XX Using Table XX,the critical path for this project consists of activities</strong> A)A-B-C-D-E-F. B)A-C-E-F. C)A-B-C-F. D)A-B-D-F. Table XX
Using Table XX,the critical path for this project consists of activities

A)A-B-C-D-E-F.
B)A-C-E-F.
C)A-B-C-F.
D)A-B-D-F.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.