The beta distribution is used in project management to:
A) calculate slack on activities not on the critical path.
B) calculate the probability that a project will be completed within its budget.
C) calculate pessimistic and optimistic activity times.
D) determine which activity should be crashed.
E) none of the above
Correct Answer:
Verified
Q90: In a PERT network, non-critical activities that
Q96: Which of the following statements regarding PERT
Q97: Contract requirements state that a project must
Q98: An activity on a PERT network has
Q100: A local project being analyzed by PERT
Q101: A project whose critical path has an
Q101: Consider the network described in the table
Q103: Project management at the Tour de France
Q125: A network has been crashed to the
Q129: _ is decreasing activity time in a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents