Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Business
Study Set
Operations Management Sustainability Study Set 3
Quiz 9: Layout Strategies
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 81
Multiple Choice
The central problem in product-oriented layout planning is
Question 82
Multiple Choice
A production line is to be designed for a product whose completion requires 21 minutes of work. The factory works 400 minutes per day. Can an assembly line with five workstations make 100 units per day?
Question 83
Multiple Choice
In assembly line balancing, the theoretical minimum number of workstations is
Question 84
Multiple Choice
Which of the following is not a heuristic rule for assigning tasks to workstations in a product layout?
Question 85
Multiple Choice
Which of the following is a common heuristic for assembly line balancing?
Question 86
Multiple Choice
Four hundred and eighty minutes of production time are available per day. Scheduled production is 120 units per day. What is the required cycle time?
Question 87
Multiple Choice
A disadvantage of product-oriented layout is that
Question 88
Multiple Choice
The main advantage of a product-oriented layout is typically
Question 89
Multiple Choice
Which of these layouts is most suitable for processing sugar from sugar beets or sugar cane?
Question 90
Multiple Choice
In assembly line balancing, cycle time (the ratio of available production time to scheduled production) is the
Question 91
Multiple Choice
An assembly line consists of 21 tasks grouped into 5 workstations. The sum of the 21 task times is 85 minutes. The largest assigned cycle time is 20 minutes. The efficiency of this line is
Question 92
Multiple Choice
Cycle time is computed as
Question 93
Multiple Choice
A production line is to be designed to make 500 El-More dolls per day. Each doll requires 11 activities totaling 16 minutes of work. The factory operates 750 minutes per day. The required cycle time for this assembly line is