The construction drawings for a building project generally consist of
A) architectural drawings, structural drawings, and MEP drawings.
B) architectural drawings and structural drawings.
C) architectural drawings, structural drawings, MEP, and QSA drawings.
D) architectural drawings, structural drawings, and QSA drawings.
E) none of the above.
Correct Answer:
Verified
Q13: MasterFormat consists of
A)20 divisions.
B)30 divisions.
C)40 divisions.
D)50 divisions.
E)none
Q14: In MasterFormat, flooring is part of
A)Division 07.
B)Division
Q15: Establishing the project's economic feasibility and its
Q16: The construction drawings of a building project
Q17: The construction drawings of a building project
Q19: MasterFormat has been developed by the
A)Associated General
Q20: In MasterFormat, windows are part of
A)Division 06.
B)Division
Q21: The shop drawings are prepared by the
A)structural
Q22: When does the owner receive manufacturers' warranties
Q23: A record document set includes
A)as- built construction
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents