When does the owner receive manufacturers' warranties from the GC?
A) At final completion inspection
B) Within one week of the GC receiving warranties from the respective manufacturer or subcontractor
C) At substantial completion inspection
D) None of the above
Correct Answer:
Verified
Q17: The construction drawings of a building project
Q18: The construction drawings for a building project
Q19: MasterFormat has been developed by the
A)Associated General
Q20: In MasterFormat, windows are part of
A)Division 06.
B)Division
Q21: The shop drawings are prepared by the
A)structural
Q23: A record document set includes
A)as- built construction
Q24: The certificate of substantial completion is issued
Q25: In which of the following project delivery
Q26: The final completion inspection of the project
Q27: The project manual includes the project's construction
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents