Multiple Choice
The project delivery method in which only one firm is contracted for both design and construction of the building is called the
Question 42
Multiple Choice
In the CMAR method of project delivery, the CM
Question 43
Essay
In which of the three documents (construction documents, bidding documents, and contract documents)are contract modifications included?
Question 44
Essay
In most building projects, the consultants are hired by the architect to ensure complete coordination among the tasks of the architect and the consultants. However, in some projects, one or more consultants may be hired directly by the owner (sometimes before the selection of the architect). In such cases, the architect may still be held accountable for any error committed by the owner- appointed consultant(s). Explain why that is so.
Question 45
Essay
What is contained in the program of a building project?
Question 46
Essay
The MasterFormat has two separate divisions called "Specialties" and "Special Construction." What is the difference between them?
Question 47
Essay
Building design is generally a teamwork comprising several design professionals. Who is the prime design professional in most building projects?
Question 48
Multiple Choice
The project delivery method that should ensure the least amount of litigation among parties contributing to the project is the
Question 49
Essay
Is the preparation of the program for the project generally included as part of the architect's "basic" services, or is the architect compensated additionally if asked to assist in the preparation of the program?
Question 50
True/False
BIM is the most recently developed project delivery method.
Question 51
Essay
In reality, who bears the cost of surety bonds that the GC has to provide to the owner and why?
Question 52
Short Answer
In which project delivery phase is the decision generally made whether the project is to be designed to earn a certain level of sustainability rating?
Question 53
Short Answer
Which project delivery phase comes after the design phase?
Question 54
Essay
The design phase of a project is generally divided into three stages that are sequential. List these stages in sequential order in spelt- out format along with their acronyms.