The cost associated with unplanned machine downtime,when operators halt the production line after identifying an unacceptably high rate of defective output,should be classified as:
A) a prevention cost.
B) an internal quality cost.
C) an internal failure cost.
D) a reactive failure cost.
Correct Answer:
Verified
Q60: Because of the negative connotation of "defect"
Q61: A credit card company has identified speed
Q62: Which of the following is NOT an
Q63: Better prevention of poor quality:
A)reduces internal and
Q64: A collection of indicators summarizing organizational performance
Q66: The term 'dpmo' stands for:
A)defective parts manufactured
Q67: An advantage of cost of quality measures
Q68: Which of the following is NOT a
Q69: A measure is _ if it provides
Q70: The cost of purchasing copies of a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents