True/False
When constructing a u-chart,the standard deviation of each sample varies because the size of the sampling unit varies.
Question 22
Multiple Choice
If a process is neither capable nor in control,the appropriate first step is to:
Question 23
True/False
Control limits for variables and attributes data utilize different mathematical formulas.
Question 24
Multiple Choice
The output of a process is stable and normally distributed.If the process mean equals 23.5,the percentage of output expected to be less than or equal to the mean:
Question 25
Multiple Choice
_____ is measured as the amount of error in a measurement in proportion to the total size of the measurement.
Question 26
Multiple Choice
Compared to variable measurement,attributes measurement requires _____ to obtain the same amount of statistical information about the quality of the product.
Question 27
Multiple Choice
In pre-control,which zone covers the nominal specification of a process?
Question 28
Multiple Choice
In service applications,the term _____ is generally used to describe a nonconformance.
Question 29
True/False
If the cost of investigating an operation to identify the cause of an apparent out-of-control condition is low,narrower control limits should be selected.
Question 30
True/False
In determining the method of sampling,samples should be chosen to be as heterogeneous as possible so that each sample reflects the system of common causes or assignable causes that may be present at that point in time.