Solved

Ken Is a Production Operator Who Plots a Sample of the Product

Question 105

Short Answer

Ken is a production operator who plots a sample of the product and finds that it is outside the upper or lower specification limits on the control chart. What should he do?
Continue with production and analyze why the problem might be occurring
Do nothing; wait to see if the next sample is within the control limits
Tell co-workers "the sky is falling!"
Correct the problem (e.g., people, equipment, materials, or work methods)
Shut down the machine and have a manager investigate the problem

Correct Answer:

verifed

Verified

Shut down the machin...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents