Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Business
Study Set
Financial and Managerial Accounting Study Set 9
Quiz 22: Performance Evaluation Using Variances From Standard Costs
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 21
True/False
If the standard to produce a given amount of product is 500 direct labor hours at $15 and the actual was 600 hours at $17, the rate variance was $1,200 favorable.
Question 22
True/False
If the standard to produce a given amount of product is 1,000 units of direct materials at $11 and the actual was 800 units at $12, the direct materials quantity variance was $1,000 unfavorable.
Question 23
True/False
Standard costs are determined by multiplying expected price by expected quantity.
Question 24
True/False
The variance from standard for factory overhead resulting from incurring a total amount of factory overhead cost that is greater or less than the amount budgeted for the level of operations achieved is termed controllable variance.
Question 25
True/False
If the standard to produce a given amount of product is 600 direct labor hours at $15 and the actual was 600 hours at $17, the rate variance was $1,200 unfavorable.
Question 26
True/False
If the standard to produce a given amount of product is 2,000 units of direct materials at $12 and the actual was 1,600 units at $13, the direct materials quantity variance was $5,200 favorable.
Question 27
True/False
If the standard to produce a given amount of product is 1,000 units of direct materials at $11 and the actual was 800 units at $12, the direct materials price variance was $800 favorable.