-Consider the Digraphs Shown Above ; Which of the Digraphs

Question 40

Multiple Choice

  -Consider the digraphs shown above ; which of the digraphs have an outdegree of 3 at vertex O?  A)  Only figure 1 B)  Only figure 2 C)  Only figure 3 D)  Both figure 1 and figure 3 E)  None of the above.
-Consider the digraphs shown above ; which of the digraphs have an outdegree of 3 at vertex O?


A) Only figure 1
B) Only figure 2
C) Only figure 3
D) Both figure 1 and figure 3
E) None of the above.

Correct Answer: