Value engineering is?
A) Reducing new product cost by use of readily available parts
B) Use of cheaper materials and simpler designs
C) Both reducing new product cost by use of readily available parts and use of cheaper materials and simpler designs
D) Neither reducing new product cost by use of readily available parts nor use of cheaper materials and simpler designs
Correct Answer:
Verified
Q48: All of the following are associated with
Q49: On a service blueprint, the line that
Q50: A firm that modifies a product design
Q51: Inviting supplier representatives to participate on new
Q52: A company that chooses to use "off-the-shelf"
Q54: Simultaneous design of products and their manufacturing
Q55: Environmental impacts of products may include all
Q56: The Japanese name for concurrent engineering practices
Q57: A firm plans to spend $50,000 on
Q58: Final product testing is likely to involve
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents