Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Statistics
Study Set
Basic Business Statistics
Quiz 17: Statistical Applications in Quality Management
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 81
True/False
An in-control process must be achieved before being able to estimate process capability.
Question 82
Multiple Choice
Which of the following best measures the ability of a process to consistently meet specified customer-driven requirement?
Question 83
Essay
TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.
-Referring to Table 17-8, construct an R chart for the time required to register.
Question 84
Multiple Choice
Developing operational definitions for each critical-to-quality characteristic involves which part of the DMAIC process?
Question 85
True/False
TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.
-Referring to Table 17-8, based on the R chart, it appears that the process is out of control.
Question 86
Short Answer
TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.
-Referring to Table 17-8, an R chart is to be constructed for the time required to register. The upper control limit for this data set is ________.
Question 87
Short Answer
TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.
-Referring to Table 17-8, an R chart is to be constructed for the time required to register. The lower control limit for this data set is ________.
Question 88
Short Answer
TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.
-Referring to Table 17-8, an
chart is to be used for the time required to register. The lower control limit for this data set is ________, while the upper control limit is ________.
Question 89
Multiple Choice
Determining the root causes of why defects can occur along with the variables in the process that cause these defects to occur involves which part of the DMAIC process?
Question 90
Short Answer
TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.
-Referring to Table 17-8, an
chart is to be used for the time required to register. The center line of this chart is located at ________.
Question 91
Essay
TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.
-Referring to Table 17-8, construct an
chart for the time required to register.
Question 92
Multiple Choice
Which of the following is a method for breaking process into a series of steps in order to eliminate defects and produce near perfect results?
Question 93
Multiple Choice
Maintaining the gains that have been made with a revised process in the long term by avoiding potential problems that can occur when a process is changed involves which part of the DMAIC process?