
The just-in-time (JIT) system is a(n) :
A) management system of people and procedures to fulfill all delivery deadlines.
B) production system of small-lot manufacturing to reduce work-in-process inventory.
C) materials management system for removing all inventories.
D) integrated system of managing resources, information, and decision processes to eliminate waste.
Correct Answer:
Verified
Q1: Regarding the Eight Types of Waste that
Q2: Continuous improvement with lean systems:
A) involves navigating
Q3: An operator standing idly by his workstation
Q4: In a lean system, the key to
Q5: In manufacturing systems, one way to achieve
Q7: _ is the philosophy that waste can
Q8: Which of the following statements is True
Q9: In lean systems, work-in-process inventory is a
Q10: Kaizen is the Japanese term for continuous
Q11: What did the production manager say to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents