
Which of the following statements is True with regard to the eight types of waste that must be eliminated to implement lean systems?
A) Jobs with excessive motion should be redesigned.
B) Work-in-process inventory is the direct result of underutilization of employees.
C) Manufacturing an item before it is needed helps an organization detect and reduce defects.
D) Product damage and deterioration result from using expensive high precision equipment.
Correct Answer:
Verified
Q3: An operator standing idly by his workstation
Q4: In a lean system, the key to
Q5: In manufacturing systems, one way to achieve
Q6: The just-in-time (JIT) system is a(n):
A) management
Q7: _ is the philosophy that waste can
Q9: In lean systems, work-in-process inventory is a
Q10: Kaizen is the Japanese term for continuous
Q11: What did the production manager say to
Q12: The Japanese term for continuous improvement in
Q13: In a lean system, large inventories are
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents