
In a lean system, large inventories are not considered a type of waste, because they prevent operator wait times.
Correct Answer:
Verified
Q8: Which of the following statements is True
Q9: In lean systems, work-in-process inventory is a
Q10: Kaizen is the Japanese term for continuous
Q11: What did the production manager say to
Q12: The Japanese term for continuous improvement in
Q14: Regarding the Eight Types of Waste that
Q15: Regarding the Eight Types of Waste that
Q16: List and briefly define the eight types
Q17: In a lean system, an item that
Q18: Just-in-time (JIT) systems need close relationships with
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents