
Regarding the Eight Types of Waste that must be eliminated to implement lean systems, using expensive high precision equipment when a simpler machine would suffice is part of which general waste category?
A) Motion
B) Overproduction
C) Inappropriate Processing
D) Defects
Correct Answer:
Verified
Q10: Kaizen is the Japanese term for continuous
Q11: What did the production manager say to
Q12: The Japanese term for continuous improvement in
Q13: In a lean system, large inventories are
Q14: Regarding the Eight Types of Waste that
Q16: List and briefly define the eight types
Q17: In a lean system, an item that
Q18: Just-in-time (JIT) systems need close relationships with
Q19: Long production runs, poor material flows, and
Q20: The just-in-time (JIT) philosophy is the belief
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents