
Using customer demand to activate production of an item or service is called:
A) the andon method.
B) the pull method.
C) the jidoka method.
D) the push method.
Correct Answer:
Verified
Q45: The takt time of a process is
Q46: Lean systems try to:
A) produce a product
Q47: Companies using lean systems generally have:
A) many
Q48: The lean system concept will not work
Q49: The production of 150 units during a
Q51: In the Toyota Production System, when a
Q52: In the Toyota Production System, services and
Q53: Justin Thyme used to run one batch
Q54: The production of 240 units during a
Q55: In lean systems, if a defective product
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents