
In lean systems, if a defective product is found, which of the following is generally not done?
A) The production line is stopped.
B) The defective unit is passed on to the next workstation.
C) The defective unit is returned to the worker responsible for creating the defect.
D) The production line is made aware of the problem without necessarily stopping the line.
Correct Answer:
Verified
Q50: Using customer demand to activate production of
Q51: In the Toyota Production System, when a
Q52: In the Toyota Production System, services and
Q53: Justin Thyme used to run one batch
Q54: The production of 240 units during a
Q56: Mistake-proofing is known by the term:
A) andon.
B)
Q57: Lean systems use the standardization of components
Q58: Automatically stopping the process when something is
Q59: The goal of single-digit setups is to
Q60: Items to be assembled that fit together
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents