Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Business
Study Set
Managerial Accounting Study Set 23
Quiz 10: Standard Costs and Variances
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 1
True/False
When more hours of labor time are necessary to complete a job than the standard allows, the labor efficiency variance is unfavorable.
Question 2
True/False
The variable overhead efficiency variance measures the difference between the actual level of activity and the standard activity allowed for the actual output, multiplied by the variable part of the predetermined overhead rate.
Question 3
True/False
A quantity standard indicates how much of an input should be used to make a unit of product or provide a unit of service.
Question 4
True/False
If variable manufacturing overhead is applied based on direct labor-hours, it is impossible to have a favorable labor rate variance and unfavorable variable overhead rate variance for the same period.
Question 5
True/False
When the materials price variance is recorded at the time of purchase, raw materials are recorded as inventory at standard cost.
Question 6
True/False
The variable overhead efficiency variance measures the difference between the actual level of activity and the standard activity allowed for the actual output, multiplied by the fixed part of the predetermined overhead rate.