A production line is to be designed for a job with four tasks. The task times are 2.4 minutes, 0.4 minutes, 0.9 minutes, and 2.7 minutes. After line balancing, the largest possible assigned cycle time is ________ minutes, and the smallest possible assigned cycle time is ________ minutes.
A) 1.8; 1.4
B) 1.6; 0.4
C) 6.4; 2.4
D) 2.7; 0.4
E) 6.4; 2.7
Correct Answer:
Verified
Q293: Four hundred and eighty minutes of production
Q294: The central problem in product-oriented layout planning
Q295: The assumptions necessary for a successful product-oriented
Q296: Which of the following is NOT a
Q297: A production line is to be designed
Q299: Which of the following is one of
Q300: A production line is to be designed
Q301: Explain what the purpose of assembly-line balancing
Q302: A company is designing a product layout
Q303: Cyclone Appliances has developed a new European-style
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents