Cycle time is computed as:
A) desired output divided by the daily operating time.
B) daily operating time divided by the product of desired output and the sum of job times.
C) the product of desired output and the sum of job times divided by daily operating time.
D) daily operating time divided by the scheduled output.
E) 1.00 minus station time.
Correct Answer:
Verified
Q283: If a layout problem is solved by
Q284: An assembly line consists of 21 tasks
Q285: Which of the following is a disadvantage
Q286: Which of the following is a common
Q287: A product-oriented layout would be MOST appropriate
Q289: Which of the following is TRUE regarding
Q290: In assembly-line balancing, the theoretical minimum number
Q291: Four hundred and eighty minutes of production
Q292: In assembly-line balancing, cycle time (the ratio
Q293: Four hundred and eighty minutes of production
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents