Question 61
Multiple Choice
Consider the following information
The number of runs up and down for the preceding data is
Question 62
Multiple Choice
The process capability index (C
pk
) may mislead if (I) the process is not stable.(II) the process output is not normally distributed.(III) the process is not centered.
Question 63
Multiple Choice
The purpose of control charts is to
Question 64
Multiple Choice
If a process is performing as it should, it is still possible to obtain observations which are outside of which limits? (I) tolerances(II) control limits(III) process variability
Question 65
Multiple Choice
Consider the following information
The number of runs above and below the sample median is:
Question 66
Multiple Choice
Which of the following relationships must always be incorrect?
Question 67
Multiple Choice
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results
What is the sample mean service life for sample 2?
Question 68
Multiple Choice
A shift in the process mean for a measured characteristic would most likely be detected by a
Question 69
Multiple Choice
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results
What is the standard deviation of the sampling distribution of sample means for whenever service life is in control?
Question 70
Multiple Choice
A time-ordered plot of sample statistics is called a(n) _____ chart.
Question 71
Multiple Choice
Which of the following is not a step in the control process?
Question 72
Multiple Choice
The probability of concluding that assignable variation exists when only random variation is present is (I) the probability of a Type I error.(II) known as the alpha risk.(III) highly unlikely.(IV) the sum of probabilities in the two tails of the normal distribution.
Question 73
Multiple Choice
A plot below the lower control limit on the range chart (I) should be ignored since lower variation is desirable.(II) may be an indication that process variation has decreased.(III) should be investigated for assignable cause.