When a design firm has a project that their company has designed, who is responsible for the scheduling of the construction?
A) The owner of the project as there many subs on the job.
B) The design firm is in charge of all the schedules.
C) The contractor, however with the design firm able to estimate the time for the entire project.
D) The contractor is in complete control with no interference.
Correct Answer:
Verified
Q53: If design firm ABC wanted to add
Q54: The most widely accepted specifications format was
Q55: The ABC cabinet company has come up
Q56: The Jones's want their kitchen cabinets to
Q57: What is the purpose of a Gantt
Q59: The design firm is required on the
Q60: In the following examples below which is
Q61: The design firm has specified running trim
Q62: The Smiths want to have as part
Q63: The finish carpenter stated to the designer
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents