A bridge is to be constructed as part of a 2-lane highway renovation project. There are two alternatives, one is to construct a 4-lane bridge for $2 M , the other to construct a 2-lane bridge now for $1.5 M and a second 2-lane bridge next to it 10 years for a present value expense of $1.2. A two-lane bridge is considered adequate to handle current traffic volume, although in 10 years volume is expected to increase and require 4 lanes. Looking at a 25 year time horizon, the NPV of maintenance for the 4-lane bridge is $1.8 M; the NPV of maintenance for the initial 2-lane bridge and the later-built 2-lane bridge combined is $1.4 M. Use a B/C analysis to determine which alternative should be adopted. Assume that the "benefit" is the same for both alternatives.
Correct Answer:
Verified
Q30: The goal of portfolio management is to
Q31: Lack of portfolio management can lead to
Q32: In general, a company's project portfolio (check
Q33: The role of the PMO in portfolio
Q34: Overall, the advantages of project portfolio management
Q35: The project portfolio (check all that apply)
A)
Q36: Two approaches are being considered for a
Q38: Two technologies are being considered for
Q39: A pharmaceutical company is developing a new
Q40: Three systems development project are being
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents