Solved

A Bridge Is to Be Constructed as Part of a 2-Lane

Question 37

Essay

A bridge is to be constructed as part of a 2-lane highway renovation project. There are two alternatives, one is to construct a 4-lane bridge for $2 M , the other to construct a 2-lane bridge now for $1.5 M and a second 2-lane bridge next to it 10 years for a present value expense of $1.2. A two-lane bridge is considered adequate to handle current traffic volume, although in 10 years volume is expected to increase and require 4 lanes. Looking at a 25 year time horizon, the NPV of maintenance for the 4-lane bridge is $1.8 M; the NPV of maintenance for the initial 2-lane bridge and the later-built 2-lane bridge combined is $1.4 M. Use a B/C analysis to determine which alternative should be adopted. Assume that the "benefit" is the same for both alternatives.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents