Question 40

Essay

Three systems development project are being considered, A, B, and C. The table below shows the rated effectiveness (0-100) of four criteria and the total cost for each of the systems. Projects with a weighted effectiveness less than 80 are rejected. Compare the systems using cost-effectiveness analysis.
 System A System B System C Criterias W( weight %)EEE Functionality 40908080 Scalability 10708075 Maintainability 20759070 Ease of use 30708595 Cost $2.9M$2.5M$3.0 B\begin{array} { | l | c | c | c | c | } \hline & & \text { System } \boldsymbol { A } & \text { System } \boldsymbol { B } & \text { System } C \\\hline \text { Criterias } & W ( \text { weight } \% ) & E & E & E \\\hline \text { Functionality } & 40 & 90 & 80 & 80 \\\hline \text { Scalability } & 10 & 70 & 80 & 75 \\\hline \text { Maintainability } & 20 & 75 & 90 & 70 \\\hline \text { Ease of use } & 30 & 70 & 85 & 95 \\\hline \text { Cost } & & \$ 2.9 \mathrm { M } & \$ 2.5 \mathrm { M } & \$ 3.0 \mathrm {~B} \\\hline\end{array}

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents