Match these items.
-Design capacity
A) When demand and design capacity are equal
B) Planned with a specific output level
C) Uses production level changes to match changes in demand
D) Is completed at the component level
E) Recognizes the role constraints play in productive systems
F) Uses inventory and variable labor to cope with demand fluctuations
G) May result in an overbooking policy
H) Uses the master production schedule as the source of product demand information
I) Used to add flexibility to operations
J) Uses finished product inventory to deal with demand fluctuations
Correct Answer:
Verified
Q42: Rough-cut capacity planning is completed at the
Q43: _ _ has been considered as a
Q44: Match these items.
-Protective capacity
A) When demand and
Q45: Match these items.
-No shows
A) When demand and
Q46: Match these items.
-Level production
A) When demand and
Q48: Match these items.
-Constraint management
A) When demand and
Q49: Match these items.
-Rough-cut capacity planning
A) When demand
Q50: Match these items.
-Aggregate planning
A) When demand and
Q51: Match these items.
-Best operating level
A) When demand
Q52: Match these items.
-Capacity Requirements Planning
A) When demand
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents