Match these items.
-Aggregate planning
A) When demand and design capacity are equal
B) Planned with a specific output level
C) Uses production level changes to match changes in demand
D) Is completed at the component level
E) Recognizes the role constraints play in productive systems
F) Uses inventory and variable labor to cope with demand fluctuations
G) May result in an overbooking policy
H) Uses the master production schedule as the source of product demand information
I) Used to add flexibility to operations
J) Uses finished product inventory to deal with demand fluctuations
Correct Answer:
Verified
Q45: Match these items.
-No shows
A) When demand and
Q46: Match these items.
-Level production
A) When demand and
Q47: Match these items.
-Design capacity
A) When demand and
Q48: Match these items.
-Constraint management
A) When demand and
Q49: Match these items.
-Rough-cut capacity planning
A) When demand
Q51: Match these items.
-Best operating level
A) When demand
Q52: Match these items.
-Capacity Requirements Planning
A) When demand
Q53: Match these items.
-Demand chase
A) When demand and
Q54: ABC copier is located in downtown
Q55: A local bank has been using a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents