In a guaranteed maximum price contract, costs above the guarantee are absorbed by the owner.
Correct Answer:
Verified
Q1: One advantage of the design/build approach is
Q2: In the case of design/build, the constructor
Q3: In the construction industry of the future,
Q4: In the construction management approach, the construction
Q5: In comparison to other industries, the construction
Q7: Unlike the high-technology industry, the construction industry
Q8: A structural engineer is responsible for locating
Q9: If an owner has only a fixed
Q10: One advantage of a Design/Bid/Build delivery method
Q11: Which category of construction is the largest?